The Rise of Domestic Gas Obligations

The increase of domestic gas ("domgas") obligations imposed by Host States in pipeline gas or LNG export projects has become a trend in the international gas industry. [1]

A "domgas" obligation is a mandate established by contract or regulation by a Host State over a hydrocarbons producer/exporter so as to allocate a portion of its natural gas reserves and production to the domestic market, on a permanent or temporary basis, in exchange for a consideration or as part of the Government-take. [2]

In a world where gas exporting countries are increasing their domestic consumption at astonishing rates (e.g., Egypt, Russia, even Qatar), "domgas" schemes are gathering momentum. Despite a worldwide surge in gas production during the last decades, some States have not been able to simultaneously meet their overseas gas commitments and their fast-growing domestic demand for gas, forcing the curtailment of pipeline exports and the progressive slowdown in LNG exports as the domestic sector is prioritized. [3]

Ideally, States should consider the terms and conditions of E&P contracts executed or approved before any "domgas" obligation is established. If the producer/exporter holds a right to freely export gas or LNG, States should consider grandfathering such E&P contracts, or if not, accept the risk of being exposed to legal claims brought by such investors. However, the reality is that Host States respond to economic and political pressure, which generally prevail over respecting existing investors' rights. [4]

In this context, in addition to structuring an investment under the protection of a Bilateral Investment Treaty (BIT), a precise allocation of the "regulatory risk" within the gas export agreement or LNG sales and purchase agreement (SPA) is fundamental and may be achieved, for example, by using a "regulatory force majeure" clause.

The "Deliver-or-Pay Wars" of the Southern Cone

During the 1980s, the U.S. experienced the so-called "take-or-pay" wars between natural gas producers (acting as "sellers") and pipeline companies (acting as "buyers"), triggered by a combination of natural gas surplus and falling natural gas prices in the U.S. domestic market and "take-or-pay" clauses in gas sales agreements. [5]

Recently, during the mid-2000s onwards, the Southern Cone went through "deliver-or-pay wars" between Argentine natural gas exporters and their Brazilian, Chilean and Uruguayan customers (mainly power generators and gas distribution companies), due to a combination of gas shortage in the Argentine domestic market and "deliver-or-pay" clauses in gas export agreements. [6]

Take-or-pay and deliver-or-pay clauses follow the same pattern. They specify a monthly or annual minimum quantity of gas that the buyer or seller has to take or deliver, respectively, and if not, pay for it. Such clauses are well-known in project financing of "gas-to-power" and LNG export projects, because they protect parties from "volume risk" and are key to securing an "income stream". [7]

The Heart of the Dispute

To be discharged from their "deliver-or-pay" commitments, Argentine natural gas producers that during the mid-1990s had entered into long-term (15-20 years) gas export agreements with Brazilian, Chilean and Uruguayan importers, invoked the "force majeure" clause of their relevant agreements. In a nutshell, they alleged that the Government of Argentina had drastically changed the legal framework applicable to gas exports by imposing a "domgas" obligation and curtailing exports until the domestic market was fully supplied.

Importers rejected the "regulatory force majeure" arguing inter alia that the export curtailments were (i) not unforeseeable (as the Government of Argentina always had the right to establish a "domgas" scheme), (ii) not external (as the gas shortage in Argentina was due to the producers' lack of investment in E&P), and (iii) not impossible (as the producers could still export if they implemented energy swaps at their cost). [8]

Lessons Learned

The outcomes of these disputes have been diverse. Producers have prevailed in some, importers in others, some have been settled, and some are still in arbitration. But ultimately, in one way or another, the "force majeure" clause drafted in those gas export agreements was not as effective as it should have been.

When negotiating the "force majeure" clause in a gas export agreement or LNG SPA, producers may consider the following guidelines based on the experience gained during the "deliver-or-pay wars" of the Southern Cone:

  • Include a broad "regulatory force majeure" clause that specifically captures all types of Governmental restrictions affecting the free marketing of gas. This includes oral, de facto, and informal orders. Indeed, the Government of Argentina used to implement the export curtailments through telephone calls to the dispatch operators or transportation companies ordering them to re-route export volumes to the domestic market, without issuing any formal restriction or regulation.
  • Include both total and partial restrictions (not only prohibitions). The Government of Argentina did not prohibit gas exports but the condition precedent for exporting was to maintain the domestic market fully supplied. In practice, this obligation worked like a prohibition as one producer cannot guarantee the supply of an entire domestic market.
  • Use broad language when defining "Authority" or "Government". Such drafting should aim to capture situations where the regulation is not necessarily implemented by the enforcement authority, but rather by de-facto or ad-hoc Government officials, or even third-party private companies (gas transporters) by mandate of the Government.
  • Include a "Representation" on the main legal assumption relied upon by the parties, such as the "firm" (non-interruptible) nature of the gas export permit issued by the Host State. By way of example, a representation like this would have been helpful for the producer in the "deliver-or-pay wars" of the Southern Cone: "The Parties acknowledge that pursuant to the applicable legal framework the Seller holds a valid export license that grants the right to export xx M3/day of natural gas on a firm basis; that this right is essential to ensure the performance of seller's obligations; and that it is unaffected by any supervening gas shortages in the domestic market".
  • When facing a "force majeure" event, be clear to state whether the seller has (or does not have) the obligation to provide substitute gas or alternative fuels (e.g., diesel oil, fuel oil, LNG, etc.) and which party bears any resulting incremental costs.
  • Establish which mechanisms are triggered when a "force majeure" event occurs. Additionally to the suspension of the obligation while the event occurs, will the parties have the right to terminate the agreement upon certain conditions?
  • Be clear if the obligation (if any) to negotiate in good faith a mutual satisfactory solution entails undertaking additional costs or a "shared sacrifice".
  • If the seller makes a representation regarding the existence of sufficient gas reserves, be sure to specifically qualify certified volumes by reference to current economic and regulatory conditions in the Host State.

The Southern Cone will eventually embark on a second generation of gas export projects, as vast quantities of shale gas have been discovered in the region. Other regions (including Canada and the U.S.) are also embarking in new gas export projects. As a well-known Spanish philosopher said: "Those who cannot remember the past are condemned to repeat it".[9] Come what may, let us learn from the "deliver-or-pay wars" of the Southern Cone.
________________________
[1] See Oxford Energy Forum, Issue 93 on "East Mediterranean Gas – opportunities and challenges", dated October 10th, 2013, available at www.oxfordenergy.org/wpcms/wp-content/uploads/2013/10/OEF-93.pdf (last accessed May 19, 2014). See also The DomGas Alliance, "Western Australia's Domestic Gas Security" (Report 2010), available at www.domgas.com.au (last accessed May 19, 2014).
[2] See Tomás Lanardonne, "Domestic Gas Supply Obligation Schemes and Gas Exports: A Catch-22 Situation?", OGEL (2014).
[3] For instance, in Egypt, the domestic gas demand increased from 2.2 BCM in 1980 to 45 BCM in 2010 and could reach 56 BCM in 2015. The domestic gas demand is increasing so rapidly that the country decided at the end of 2008 to introduce a 2-year moratorium, renewed at the end of 2010, on any increase to the current level of gas exports of near 20 BCM, priority being now given to the domestic gas markets (See Hakim Darbouche et al, "East Mediterranean Gas: what kind of a game-changer", at Oxford Energy Forum, Issue 93 on "East Mediterranean Gas – opportunities and challenges", dated October 10th, 2013, available at www.oxfordenergy.org/wpcms/wp-content/uploads/2013/10/OEF-93.pdf (last accessed May 19, 2014).
[4] Argentina radically altered its natural gas regulatory framework in 2004 (including the establishment of a "domgas" scheme), after several gas export projects to Chile, Uruguay and Brazil were approved and in operation. This prompted multiple investment arbitrations against Argentina brought by natural gas producers/exporters (including ExxonMobil, Total, Wintershall, etc.). See a list of the cases at icsid.worldbank.org.
[5] See J. Michael Medina, "The Take-or-Pay Wars: A Cautionary Analysis for the Future", 27 Tulsa Law Journal 283 1991-1992.
[6] See "YPF loses on liability in Brazil gas exports case", dated May 30, 2013, Global Arbitration Review, available at globalarbitrationreview.com/news/article/31619/ypf-loses-liability-brazil-gas-exports-case/ (last accessed May 19, 2014).
[7] See Amoco (UK) Exploration Company v. Teesside Gas Transportation Limited, et al [2001], UKHL 18.
[8] See Mahmoud Reza Firoozmand, "Changed Circumstances and Immutability of Contract: a Comparative Analysis of Force Majeure and Related Doctrines", Journal of International Business Law, Volume 8, No. 2, May 2007; and "Force Majeure Clause in Long-Term Petroleum Contracts: Key Issues in Drafting", 24 Journal of Energy and Natural Resources Law 423-2006.
[9] George Santayana, The Life of Reason, 284 (2nd ed. 1922)

Tomás Lanardonne
Houston
+1 713 276 7312
tlanardonne@kslaw.com

View Profile »

 

Vera de Gyarfas
Houston
+1 713 495 8815
vdebritodegyarfas@kslaw.com

View Profile »

 

 

DISCLAIMER: Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© King & Spalding | Attorney Advertising

Written by:

King & Spalding
Contact
more
less

King & Spalding on:

Readers' Choice 2017
Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
Sign up using*

Already signed up? Log in here

*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Privacy Policy (Updated: October 8, 2015):
hide

JD Supra provides users with access to its legal industry publishing services (the "Service") through its website (the "Website") as well as through other sources. Our policies with regard to data collection and use of personal information of users of the Service, regardless of the manner in which users access the Service, and visitors to the Website are set forth in this statement ("Policy"). By using the Service, you signify your acceptance of this Policy.

Information Collection and Use by JD Supra

JD Supra collects users' names, companies, titles, e-mail address and industry. JD Supra also tracks the pages that users visit, logs IP addresses and aggregates non-personally identifiable user data and browser type. This data is gathered using cookies and other technologies.

The information and data collected is used to authenticate users and to send notifications relating to the Service, including email alerts to which users have subscribed; to manage the Service and Website, to improve the Service and to customize the user's experience. This information is also provided to the authors of the content to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

JD Supra does not sell, rent or otherwise provide your details to third parties, other than to the authors of the content on JD Supra.

If you prefer not to enable cookies, you may change your browser settings to disable cookies; however, please note that rejecting cookies while visiting the Website may result in certain parts of the Website not operating correctly or as efficiently as if cookies were allowed.

Email Choice/Opt-out

Users who opt in to receive emails may choose to no longer receive e-mail updates and newsletters by selecting the "opt-out of future email" option in the email they receive from JD Supra or in their JD Supra account management screen.

Security

JD Supra takes reasonable precautions to insure that user information is kept private. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. However, please note that no method of transmitting or storing data is completely secure and we cannot guarantee the security of user information. Unauthorized entry or use, hardware or software failure, and other factors may compromise the security of user information at any time.

If you have reason to believe that your interaction with us is no longer secure, you must immediately notify us of the problem by contacting us at info@jdsupra.com. In the unlikely event that we believe that the security of your user information in our possession or control may have been compromised, we may seek to notify you of that development and, if so, will endeavor to do so as promptly as practicable under the circumstances.

Sharing and Disclosure of Information JD Supra Collects

Except as otherwise described in this privacy statement, JD Supra will not disclose personal information to any third party unless we believe that disclosure is necessary to: (1) comply with applicable laws; (2) respond to governmental inquiries or requests; (3) comply with valid legal process; (4) protect the rights, privacy, safety or property of JD Supra, users of the Service, Website visitors or the public; (5) permit us to pursue available remedies or limit the damages that we may sustain; and (6) enforce our Terms & Conditions of Use.

In the event there is a change in the corporate structure of JD Supra such as, but not limited to, merger, consolidation, sale, liquidation or transfer of substantial assets, JD Supra may, in its sole discretion, transfer, sell or assign information collected on and through the Service to one or more affiliated or unaffiliated third parties.

Links to Other Websites

This Website and the Service may contain links to other websites. The operator of such other websites may collect information about you, including through cookies or other technologies. If you are using the Service through the Website and link to another site, you will leave the Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We shall have no responsibility or liability for your visitation to, and the data collection and use practices of, such other sites. This Policy applies solely to the information collected in connection with your use of this Website and does not apply to any practices conducted offline or in connection with any other websites.

Changes in Our Privacy Policy

We reserve the right to change this Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our privacy policy will become effective upon posting of the revised policy on the Website. By continuing to use the Service or Website following such changes, you will be deemed to have agreed to such changes. If you do not agree with the terms of this Policy, as it may be amended from time to time, in whole or part, please do not continue using the Service or the Website.

Contacting JD Supra

If you have any questions about this privacy statement, the practices of this site, your dealings with this Web site, or if you would like to change any of the information you have provided to us, please contact us at: info@jdsupra.com.

- hide
*With LinkedIn, you don't need to create a separate login to manage your free JD Supra account, and we can make suggestions based on your needs and interests. We will not post anything on LinkedIn in your name. Or, sign up using your email address.
Feedback? Tell us what you think of the new jdsupra.com!