Introduction
On May 19, 2014, the Environmental Protection Agency (EPA) released a long-delayed final rulemaking regulating cooling water intake structures at existing facilities under Section 316(b) of the Clean Water Act (CWA). For more than two decades, environmental advocates have pushed EPA to issue a rule under Section 316(b) in order to protect aquatic organisms, such as fish and shellfish, that become pinned against cooling water intake structures (impingement) or are drawn into cooling water systems (entrainment). Previously, EPA issued rules governing cooling water intakes at new facilities. The latest rulemaking addresses intakes at existing facilities. If unchallenged in court, this final rule would conclude what has been more than twenty years of litigation between EPA and environmental organizations.

Section 316(b) requires that the location, design, construction, and capacity of cooling water intake structures for facilities having a National Pollutant Discharge Elimination System (NPDES) permit “reflect the best technology available for minimizing adverse environmental impact.” [1] The final rule seeks to minimize environmental harm associated with cooling water intake structures by identifying the best technology available (BTA) to reduce impingement and entrainment for certain categories of existing facilities and new units at existing facilities. These new requirements will be implemented through NPDES permits under Section 402 of the Clean Water Act.

According to the EPA, the final rule will affect approximately 1,065 existing facilities, of which 544 are power plants and 521 are manufacturing and industrial facilities. Regulated facilities include electric generating plants, petroleum refineries, chemical manufacturing plants, iron and steel mills, and aluminum production and processing plants.

Legal Background
The final rule follows a lengthy history of court challenges and administrative proceedings. Following a 1993 lawsuit, EPA entered into a consent decree which prescribed deadlines for three separate rulemakings implementing Section 316(b). Performing under the consent decree, EPA issued cooling water intake structure regulations for all new facilities in December 2001 (Phase I), for all existing large electric-generating facilities in February 2004 (Phase II), and for all existing small electric-generating facilities and manufacturing facilities in June 2006 (Phase III). As a result of further legal challenges, the Phase II rule and aspects of the Phase III rule were remanded to EPA for reconsideration. [2] In another settlement in 2010, EPA agreed to issue a final rule by July 27, 2012. EPA published a proposed rule on April 20, 2011 and two Notices of Data Availability in June 2012. [3] The May 19 final rule replaces the remanded rules and satisfies EPA’s responsibility under the 2010 settlement agreement.

Final Rule
The final rule applies to existing facilities that have or are required to have an NPDES permit, are designed to withdraw more than two million gallons per day (mgd) from waters of the United States, and use at least 25 percent of the withdrawn water exclusively for cooling purposes. The rule does not regulate existing facilities which currently withdraw cooling water from an impoundment that is not itself a water of the United States and that does not withdraw any make-up water from such waters, and the final rule does not count toward the applicability thresholds cooling water obtained from a public water system, reclaimed water from wastewater treatment facilities or desalination plants, or treated process wastewater effluent used as cooling water.

Generally, the rule requires the following:

  • Existing facilities subject to the rule must achieve a national BTA standard for impingement mortality through one of seven alternatives specified in the rule.
  • Existing facilities subject to the rule must implement site-specific entrainment requirements as decided by the permitting agency. [4] In addition, existing facilities that actually withdraw at least 125 mgd must conduct an “Entrainment Characterization Study” intended to assist the permitting agency in assessing which, if any, site-specific controls are necessary to achieve BTA for entrainment.
  • New units at existing facilities subject to the rule must achieve national BTA standards for impingement mortality and entrainment through one of two alternatives specified in the rule.

BTA Standard for Impingement Mortality for Existing Units at Existing Facilities
The national BTA impingement mortality standard identifies seven alternatives for compliance. These alternatives are as follows:

  1. operate a closed-cycle recirculating system, such as a cooling tower;
  2. operate a cooling water intake structure with a maximum through-screen design intake velocity of 0.5 feet per second (fps);
  3. operate a cooling water intake structure with a maximum through-screen actual intake velocity of 0.5 fps;
  4. operate an offshore velocity cap that is installed before the final rule is effective;
  5. operate a modified traveling screen that meets regulatory criteria and that the permitting agency determines is the best technology available for impingement reduction;
  6. operate a combination of technologies, management practices, and operational measures that the permitting agency determines is the best technology available for impingement reduction; or
  7. achieve the specified impingement mortality performance standard.

Under the rule, an NPDES permit need not require additional controls if none are warranted to meet the impingement mortality standard due to a de minimis rate of impingement.

Although EPA included fish restoration measures as a BTA compliance option in the 2004 Phase II rule, the Second Circuit later held these measures were not a permissible means of compliance with any 316(b) standard. Accordingly, the final rule does not recognize restoration as a compliance method.

The final rule clarifies that existing facilities can choose whether to demonstrate compliance for an entire facility or for each intake structure. Compliance with the national impingement mortality standard is required as soon as practicable after issuance of a final permit establishing entrainment requirements. Considering that an NPDES permit applicant has more than three years to complete certain requirements under the final rule, some facilities will face long-off deadlines for compliance with the BTA impingement mortality standard. This occurs because, unlike the proposed rule, the final rule coordinates the BTA impingement and entrainment compliance scheduling.

BTA Standard for Entrainment for Existing Units at Existing Facilities
The final rule does not establish a national BTA entrainment standard; rather, the rule creates a regulatory framework through which the permitting agency will determine BTA entrainment requirements for a facility on a case-by-case basis. This determination must reflect the maximum entrainment reduction warranted. Factors that the permitting agency must consider include: the numbers and types of organisms entrained, including threatened and endangered species; the impact of changes in particulate emissions or other pollutants; land availability relating to the feasibility of entrainment technology; remaining useful plant life; and the quantified and qualitative social benefits and costs of available technologies. Other potential factors for consideration include impacts to energy delivery reliability within the immediate area and credit for reductions in flow associated with the retirement of units occurring within the ten years preceding the effective date of the rule.

Existing facilities with an actual intake flow greater than 125 mgd must submit an Entrainment Characterization Study with an NPDES permit application. Facilities have up to 39 months to complete the Study, which by regulation must include a minimum of two years of entrainment data collection. The permitting agency is intended to evaluate the Study when determining which controls are necessary to achieve BTA for entrainment.

BTA Standard for Impingement Mortality and Entrainment for New Units at Existing Facilities
The final rule distinguishes between new facilities and new units constructed at existing facilities. New units at existing facilities can include those constructed at a stand-alone location at an existing intake structure, those constructed adjacent to an existing unit for the same industrial activity, and those constructed to replace a retired and demolished unit in same location. The new unit requirement applies to units constructed after the effective date of the rule.

Under the final rule for new units, EPA selected closed-cycle recirculating systems based on wet cooling towers as BTA for both impingement and entrainment. New units can demonstrate compliance either by reducing design intake flow to a level commensurate with that of a closed-cycle system or demonstrating that installed technology will reduce adverse environmental impact to a level comparable to what would be obtained with a closed-cycle system. If compliance would result in disproportionate compliance costs or significant adverse impacts to threatened and endangered species, local air quality, local water resources, or local energy markets, the permitting agency can establish alternative entrainment requirements.

Other Regulation on a Case-by-Case, Best Professional Judgment Basis
Prior to this rule, the Clean Water Act required agencies issuing NPDES permits to regulate cooling water intake structures on a case-by-case, best professional judgment (BPJ) basis. Under the final rule, EPA has established BTA for certain facilities with cooling water intake structures. Other existing facilities subject to Section 316(b) that withdraw less than two mgd from waters of the United States or use less than 25 percent of withdrawn water for cooling purposes will continue to be regulated on a case-by-case, BPJ basis. The determination of BTA requirements for intake structures at existing offshore oil and gas facilities, offshore seafood processing facilities, and liquefied natural gas terminals will also occur on a case-by-case, BPJ basis.

Enhanced Consideration of Threatened and Endangered Species
Currently, a state agency issuing an NPDES permit is not required to send a permit application to federal resources agencies for review; the final rule, however, requires that applications for existing facilities addressing Section 316(b) are to be shared with the U.S. Fish and Wildlife Service or National Marine Fishery Service for review. The rule provides the FWS or NMFS with a 60-day period prior to the public notice of the draft or proposed permit to consider potential impacts to federally listed threatened and endanger species and designated critical habitat and to issue recommendations to the permitting agency.

Conclusion
After many years of listing a Section 316(b) rule on its regulatory agenda, EPA issued a final rule to establish standards for regulating cooling water intake structures at existing facilities. The action constituted an end to major rulemaking under the Clean Water Act, or at least the potential of an end. The rule will become effective 60 days after its publication in the Federal Register, at which time more than 1,000 facilities will face significant compliance requirements.

Notes:
[1] 33 U.S.C. 1326(b).

[2] Riverkeeper, Inc. v. EPA, 358 F.3d 174 (2d Cir. 2004) (remanding those provisions of the Phase I Rule that allow compliance through restoration measures); Riverkeeper, Inc. v. EPA, 475 F.3d 83 (2d Cir. 2007) (remanding for further clarification EPA’s decision to reject closed-cycle cooling as BTA, among other provisions.)

[3] Proposed Rule, 76 Fed. Reg. 22174 (April 20, 2011); Notice of Data Availability—Impingement Mortality Control Requirements, 77 Fed. Reg. 34315 (June 11, 2012); Notice of Data Availability—Stated Preference Survey 77 Fed. Reg. 34927 (June 12, 2012).

[4] Currently, 46 states administer an NPDES program, with EPA officials issuing permits in the remaining states.

 

Written by:

K&L Gates LLP
Contact
more
less

K&L Gates LLP on:

Readers' Choice 2017
Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
Sign up using*

Already signed up? Log in here

*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Privacy Policy (Updated: October 8, 2015):
hide

JD Supra provides users with access to its legal industry publishing services (the "Service") through its website (the "Website") as well as through other sources. Our policies with regard to data collection and use of personal information of users of the Service, regardless of the manner in which users access the Service, and visitors to the Website are set forth in this statement ("Policy"). By using the Service, you signify your acceptance of this Policy.

Information Collection and Use by JD Supra

JD Supra collects users' names, companies, titles, e-mail address and industry. JD Supra also tracks the pages that users visit, logs IP addresses and aggregates non-personally identifiable user data and browser type. This data is gathered using cookies and other technologies.

The information and data collected is used to authenticate users and to send notifications relating to the Service, including email alerts to which users have subscribed; to manage the Service and Website, to improve the Service and to customize the user's experience. This information is also provided to the authors of the content to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

JD Supra does not sell, rent or otherwise provide your details to third parties, other than to the authors of the content on JD Supra.

If you prefer not to enable cookies, you may change your browser settings to disable cookies; however, please note that rejecting cookies while visiting the Website may result in certain parts of the Website not operating correctly or as efficiently as if cookies were allowed.

Email Choice/Opt-out

Users who opt in to receive emails may choose to no longer receive e-mail updates and newsletters by selecting the "opt-out of future email" option in the email they receive from JD Supra or in their JD Supra account management screen.

Security

JD Supra takes reasonable precautions to insure that user information is kept private. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. However, please note that no method of transmitting or storing data is completely secure and we cannot guarantee the security of user information. Unauthorized entry or use, hardware or software failure, and other factors may compromise the security of user information at any time.

If you have reason to believe that your interaction with us is no longer secure, you must immediately notify us of the problem by contacting us at info@jdsupra.com. In the unlikely event that we believe that the security of your user information in our possession or control may have been compromised, we may seek to notify you of that development and, if so, will endeavor to do so as promptly as practicable under the circumstances.

Sharing and Disclosure of Information JD Supra Collects

Except as otherwise described in this privacy statement, JD Supra will not disclose personal information to any third party unless we believe that disclosure is necessary to: (1) comply with applicable laws; (2) respond to governmental inquiries or requests; (3) comply with valid legal process; (4) protect the rights, privacy, safety or property of JD Supra, users of the Service, Website visitors or the public; (5) permit us to pursue available remedies or limit the damages that we may sustain; and (6) enforce our Terms & Conditions of Use.

In the event there is a change in the corporate structure of JD Supra such as, but not limited to, merger, consolidation, sale, liquidation or transfer of substantial assets, JD Supra may, in its sole discretion, transfer, sell or assign information collected on and through the Service to one or more affiliated or unaffiliated third parties.

Links to Other Websites

This Website and the Service may contain links to other websites. The operator of such other websites may collect information about you, including through cookies or other technologies. If you are using the Service through the Website and link to another site, you will leave the Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We shall have no responsibility or liability for your visitation to, and the data collection and use practices of, such other sites. This Policy applies solely to the information collected in connection with your use of this Website and does not apply to any practices conducted offline or in connection with any other websites.

Changes in Our Privacy Policy

We reserve the right to change this Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our privacy policy will become effective upon posting of the revised policy on the Website. By continuing to use the Service or Website following such changes, you will be deemed to have agreed to such changes. If you do not agree with the terms of this Policy, as it may be amended from time to time, in whole or part, please do not continue using the Service or the Website.

Contacting JD Supra

If you have any questions about this privacy statement, the practices of this site, your dealings with this Web site, or if you would like to change any of the information you have provided to us, please contact us at: info@jdsupra.com.

- hide
*With LinkedIn, you don't need to create a separate login to manage your free JD Supra account, and we can make suggestions based on your needs and interests. We will not post anything on LinkedIn in your name. Or, sign up using your email address.
Feedback? Tell us what you think of the new jdsupra.com!