Liquidated Damages in Purchase and Sale Agreements: Oklahoma

McAfee & Taft
Contact

McAfee & Taft

published in The Practical Real Estate Lawyer | March 2020

A buyer and seller of real estate will often include a liquidated damages provision in the purchase and sale agreement as a means for stipulating the amount of damages the seller will receive in the event of a breach of the agreement by the buyer. This article addresses issues specifically related to a seller’s rights when a liquidated damages provision is included in a real estate purchase and sale agreement.

1. May the seller choose specific performance instead of liquidated damages (so that liquidated damages are not an exclusive remedy)?

As an initial matter, specific performance is available to a seller in Oklahoma. Dillon v. Ringleman, 155 P. 563, 565 (Okla. 1916). See Also Kendall v. Hastings, 198 P.2d 998, 1000 (Okla. 1948), (“if the vendor is able to make a good title at the time stipulated for conveyance, he may ordinarily maintain an action…to compel specific performance on the part of the vendee.”); Shelton v. Wallace, 137 P. 694, 695 (Okla. 1913) (acknowledging a seller’s right to specific performance.)

In Oklahoma, a seller may seek specific performance even if a liquidated damages provision is not included in the agreement, if the agreement provides for “mutually exclusive” remedies of liquidated damages or other remedies at law or in equity. In Oltman Homes v. Mirkes, 190 P.3d 1182, 1186-1187 (Okla. Civ. App. 2008), the Oklahoma Court of Civil Appeals held that upon the breach of the contract a seller could seek damages under two mutually exclusive measures: a claim for retention of the earnest money as liquidated damages, or alternatively “it could choose to forego the liquidated damages provided by the contract and seek any other legal or equitable remedy.” Although Oltman Homes primarily addressed whether a seller could seek actual damages in lieu of liquidated damages, the holding broadly accepts the proposition that a seller could forego liquidated damages and seek any other remedy available, which in Oklahoma includes the right to specific performance as noted above.

Oltman Homes specifically addressed a situation where the parties contracted for the seller to have mutually exclusive remedies. While there is no specific case in Oklahoma that addresses a seller’s right to specific enforcement if the seller includes a liquidated damages provision as its exclusive remedy, Oklahoma courts likely would not allow a seller to seek specific performance in such a situation. See JPMorgan Chase Bank, N.A. v. Specialty Restaurants, Inc., 243 P.3d 8, 13 (Okla. 2010) (the parties are free to bargain as they see fit, and the courts will neither make a new contract or rewrite existing terms); Siloam Springs Hotel, LLC v. Century Surety Company, 392 P.3d 262, 268 (Okla. 2017) (Oklahoma courts will exercise their power to nullify contracts made in contravention of public policy only rarely, with great caution and in cases that are free from doubt).

2. May the seller choose actual damages instead of liquidated damages (so that liquidated damages are not an exclusive damages remedy)?

There is a split of authority in Oklahoma on whether a seller may choose actual damages instead of liquidated damages. In 1414 Partnership v. Taveau, 815 P.2d 1228, 1230 (Okla. Civ. App. 1991), the Oklahoma Court of Civil Appeals (Division No. 3) held that a valid and enforceable liquidated damages provision removes the question “from the authority of 23 O.S.1981 § 28” which is the statutory measure of actual damages. However, as noted above, in Oltman Homes, the Oklahoma Court of Civil Appeals (Division No. 2) held that upon the breach of the contract a seller could seek damages where the purchase agreement specifically stated that the seller had the mutually exclusive alternative remedies of retaining the earnest money as liquidated damages or foregoing the liquidated damages and seeking any other legal or equitable remedy. Oltman Homes, 190 P.3d at 1186-1187.

Notably, the facts in 1414 Partnership do not indicate that the buyer and seller had included a mutually exclusive scheme of remedies as was the case in Oltman Homes, so there is a potential means for reconciling the two holdings. Absent any such distinguishing opinion, it remains unclear whether or not a seller may choose to seek actual damages in the presence of a contractual liquidated damages provision where the agreement does not specifically limit the remedies exclusively to liquidated damages. However, in any event, a contract specifically limiting the remedies to liquidated damages would likely preclude the seller from seeking actual damages for the same reasons discussed above.

3. If the seller may choose liquidated damages or actual damages,
may it have both?

Even with the split of authority with respect to whether a seller may choose actual damages instead of liquidated damages, Oklahoma case law is consistent in that a seller may not choose both liquidated damages and actual damages. Under the 1414 Partnership rule, actual damages are not available at all if there is a liquidated damages provision in the agreement. Under Oltman Homes, though actual damages is a permissible remedy notwithstanding the inclusion of a liquidated damages provision, actual damages is only available as a mutually exclusive remedy such that the seller must forego liquidated damages before the seller can seek actual damages. Therefore, regardless of whether Oltman Homes and 1414 Partnership are contradictory in both respects, both cases stand for the proposition that a seller is not entitled to both actual and liquidated damages.

4. If the seller may choose liquidated damages or actual damages,
but not both, when must it decide?

Under 1414 Partnership, there is no deadline by which a seller must elect actual or liquidated damages because inclusion of a liquidated damages provision precludes the seller from seeking actual damages.

There is little guidance under Oklahoma case law for a seller’s election of liquidated damages or actual damages other than Oltman Homes. In Oltman Homes, the court held the seller may “upon breach of the contract” elect liquidated damages by “retaining the earnest money” or the seller could forego liquidated damages and seek actual damages (which implies, though the court does not specifically state such, that the seller must relinquish the earnest money in order to pursue actual damages). Oltman Homes, 190 P.3d at 1187.

5. Is there an applicable statute addressing liquidated damages clauses?

Yes. Title 15, section 215(B) of the Oklahoma Statutes provides:

“A provision in a real estate sales contract, providing for the payment of an amount which shall be presumed to be the amount of damages sustained by a breach of such contract, shall be held valid and not a penalty, when such amount does not exceed five percent (5%) of the purchase price. In the event such amount exceeds five percent (5%) of the purchase price, such provision shall be held invalid and a penalty unless the party seeking to uphold the provision establishes that such amount is reasonable. If such provision is valid under this subsection, the limitations of Section 28 of Title 23 of the Oklahoma Statutes do not apply.”

This statute was enacted in 1985 as a direct response to Oklahoma courts frequently finding that liquidated damages provisions were an unenforceable penalty under the test of Section 215(A) of Title 15 of the Oklahoma Statutes which provided prior to 1985 that “a stipulation or condition in a contract providing for the payment of an amount which shall be presumed to be the amount of damage sustained by a breach of such contract, shall be held valid, when, from the nature of the case, it would be impracticable or extremely difficult to fix the actual damage. In a now overturned decision in Reid v. Auxier, 690 P.2d 1057, 1061 (Okla. Civ. App. 1984), the Oklahoma Court of Civil Appeals (Division No. 4) stated the often held opinion of the courts that “it would be neither impracticable nor extremely difficult [to determine damages as outlined in Section 28 of Title 23 of the Oklahoma Statutes] and therefore the liquidated damage proviso is void.” Shortly thereafter, in 1985, the Oklahoma legislature enacted Section 215(B). 1414 Partnership analyzed the new statute and specifically called for the overruling of the Reid decision (holding “Reid is thereby no longer controlling with respect to application of the above new Subsection B statute as a measure of damages in a real estate contract”). 1414 Partnership, 815 P.2d at 1230.

6. What is the test for a valid liquidated damages clause?

The test for a valid liquidated damages clause is statutorily prescribed. A liquidated damages clause “shall be held valid and not a penalty, when such amount does not exceed five percent of the purchase price.” 15 Okla. Stat. § 215(B).

The author notes that pursuant to the statutory prescribed test the purchase and sale agreement need not recite an acknowledgement by the seller and buyer that “damages are impractical or extremely difficult to fix,” which has become commonplace to do in support of a claim that the provision did not amount to a penalty under Section 215(A). However, it remains a customary practice in Oklahoma purchase and sale agreements for such a recitation to be included within the liquidated damages clause, and it may be beneficial in the event the seller and buyer chose to implement a liquidated damages amount in excess of five percent of the purchase price (in which event the party seeking to uphold the provision must prove its reasonableness, as noted above).

7. Who has the burden of proof?

There is no burden of proof if the liquidated damages amount does not exceed five percent of the purchase price, as it is statutorily deemed valid. If, however, the liquidated damages amount is in excess of five percent of the purchase price, it is presumed a penalty unless the party seeking to uphold it establishes that the amount is reasonable. 15 Okla. Stat. § 215(B).

8. As of when is reasonableness tested?

The test of validity in Oklahoma is statutorily prescribed as a factor of the purchase price. If the liquidated damages amount does not exceed five percent of the purchase price, reasonableness is not in question.

If, however, a seller seeks to enforce a liquidated damages in excess of five percent of the purchase price (which by statute is presumed to be a penalty unless the party seeking to uphold it establishes that the amount is reasonable), it is most likely (though not expressly stated in the statute) to be analyzed by the courts on the same lines as liquidated damages provisions falling under the scope of Section 215(A), i.e. a provision not in the context of a real estate sales contract. In Sun Ridge Investors, Ltd. v. Parker, 956 P.2d 876, 878 (Okla. 1998), which involved a liquidated damages provision in a lease, the Oklahoma Supreme Court held that “the sum stipulated must be a reasonable pre-breach estimate of the probable loss.” The court was not specific in its use of the phrase “pre-breach” but it logically follows that it would be tested as of the time of the contract, as that is when the parties would have made the determination to use the stipulated amount. In other words, though the court was not clear, it is likely that “pre-breach” means at the time of contract, as opposed to sometime after the breach occurs. So, if the liquidated damages amount in a real estate purchase and sale agreement is in excess of five percent and the seller is seeking to prove that the amount is reasonable, it is likely that reasonableness will be tested based on an estimate of the probable loss determined at the time of the contract.

As noted above, there is no specific case in Oklahoma that addresses a seller’s right to specific enforcement if the seller includes a liquidated damages provision as its exclusive remedy. So, sellers should be cautious of implementing a liquidated damages provision as its exclusive remedy if the stipulated amount is in excess of five percent of the purchased price, because there is no guidance regarding what remedies (if any) a seller would be entitled to if such liquidated damages (as the exclusive remedy) was deemed unreasonable and therefore unenforceable.

9. What percentage of the purchase price is likely acceptable as liquidated damages?

If the liquidated damages amount does not exceed five percent of the purchase price, it is deemed a valid liquidated damages provision. 15 Okla. Stat. § 215(B).

10. Are actual damages relevant for liquidated damages and, in particular, will liquidated damages be allowed when there are no actual damages?

Actual damages are not relevant for liquidated damages, and liquidated damages are allowed even if there are no actual damages. In Oltman Homes, the court held that liquidated damages measured by Title 15, Section 215(B) of the Oklahoma Statutes are not limited by Title 23, Section 28, i.e. the actual damages statute, which restricts damages to those equal to “the amount which would have been due to the seller under the contract, over the value of the property.” Even if the amount of liquidated damages exceeds the difference between the contract price and the value of the property, such damages are valid so long as they do not exceed five percent of the purchase price. 15 Okla. Stat. § 215(B). See also McQueen, Rains & Tresch, LLP v. Citgo Petroleum Corp., 195 P.3d 35, 46 (Okla. 2008), rejecting the notion that there is a prerequisite requirement that the amount denominated as liquidated damages must be related to the damages actually suffered at the time of the breach. The McQueen case did not involve a real estate purchase and sale agreement (it involved an attorney-client retainer fee agreement), but it is nonetheless persuasive authority for the proposition that actual damages are irrelevant to the determination and validity of liquidated damages in a real estate purchase agreement.

11. Is mitigation relevant for liquidated damages?

There is no reported case law in Oklahoma addressing whether the mitigation of damages is relevant or required under a liquidated damages provision. But because actual damages are not relevant in determining whether a liquidated damages provision is enforceable, it follows that mitigation of actual damages is also irrelevant.

12. Is a “Shotgun” liquidated damages clause enforceable?

In Graves v. Fitzpatrick, 260 P. 10, 11 (Okla. 1927), the Oklahoma Supreme Court held “[w]here a contract provides for a number of distinct things to be done by one of the parties, and further provides a sum certain to be taken as liquidated damages, if there is only a partial breach, the sum agreed upon as liquidated damages must be held a penalty, and the plaintiff can only recover his actual damages.” Notably, however, the Graves decision was issued well before the enactment of Section 215(B), i.e. when the standard for a valid liquidated damages provision was whether “it would be impracticable or extremely difficult to fix the actual damage.” Applying that standard to a multiplicity of potential breaches the buyer could commit would most likely result in a disparity between the stipulated damages amount and the varying materiality of the various possible breaches. However, Section 215(B) does not limit its application to just breaches of the contract by failure to close, but instead merely states “by a breach of such contract.” So, it appears Section 215(B) stands to overrule the application of Graves if the liquidated damages amount does not exceed five percent of the purchase price. However, the Graves ruling may have an impact on the reasonableness analysis of a liquidated damages provision calling for stipulated damages in excess of five percent of the purchase price.

One final note regarding “shotgun” liquidated damages should be observed as a possible trend toward a new development in this application. In American Multi-Cinema, Inc. v. Southroads, 119 F.Supp.2d 1190, 1207 (D. Kan. 2000), the United States District Court of Kansas (applying Oklahoma law) rejected the “antiquated” holdings of the past, citing a trend toward acceptance of liquidated damages provisions, and held that “the proper approach here is to reject a rule that would require this court to construe the stipulated damage provision…as a penalty as to one clause…simply because the court concludes that the provision is a penalty as to [another] clause.” The court ultimately favored an integrated approach that evaluates enforceability of the liquidated damages approach on a covenant by covenant basis, meaning the liquidated damages could be enforceable with respect to the breach of one covenant, but not with respect to the breach of a different covenant.

13. Does a liquidated damages clause preclude recover of attorneys’ fees by the seller?

There is no reported Oklahoma case law specifically holding that attorneys’ fees are recoverable notwithstanding the existence of a liquidated damages provision in the agreement. However, in Oltman Homes, the court implied that, notwithstanding the fact that the parties had an enforceable liquidated damages provision, attorneys’ fees would have been awarded if the parties had included an express provision in the agreement providing for the award of attorneys’ fees, noting that “Seller may be allowed a counsel fee only if…the contract in suit provides for recovery of attorney’s fee”. Oltman Homes, 190 P.3d at 1191-1192. The Oltman Homes court ultimately did not award attorneys’ fees because there was no contractual attorneys’ fee provision and no other statutory mandate for the award of attorneys’ fees. This outcome is consistent with other Oklahoma Supreme Court rulings that employ the “American rule” with respect to attorneys’ fees, i.e. attorneys’ fees are awarded in Oklahoma only if authorized by agreement of the parties, by statute, or where the fee is an item of damage caused by the wrong itself rather than an item of expense incurred in attempting to secure redress for the wrong. Eagle Bluff, L.L.C. v. Taylor, 237 P.3d 173, 179 (Okla. 2010).

DISCLAIMER: Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© McAfee & Taft | Attorney Advertising

Written by:

McAfee & Taft
Contact
more
less

McAfee & Taft on:

Readers' Choice 2017
Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Custom Email Digest
- hide

JD Supra Privacy Policy

Updated: May 25, 2018:

JD Supra is a legal publishing service that connects experts and their content with broader audiences of professionals, journalists and associations.

This Privacy Policy describes how JD Supra, LLC ("JD Supra" or "we," "us," or "our") collects, uses and shares personal data collected from visitors to our website (located at www.jdsupra.com) (our "Website") who view only publicly-available content as well as subscribers to our services (such as our email digests or author tools)(our "Services"). By using our Website and registering for one of our Services, you are agreeing to the terms of this Privacy Policy.

Please note that if you subscribe to one of our Services, you can make choices about how we collect, use and share your information through our Privacy Center under the "My Account" dashboard (available if you are logged into your JD Supra account).

Collection of Information

Registration Information. When you register with JD Supra for our Website and Services, either as an author or as a subscriber, you will be asked to provide identifying information to create your JD Supra account ("Registration Data"), such as your:

  • Email
  • First Name
  • Last Name
  • Company Name
  • Company Industry
  • Title
  • Country

Other Information: We also collect other information you may voluntarily provide. This may include content you provide for publication. We may also receive your communications with others through our Website and Services (such as contacting an author through our Website) or communications directly with us (such as through email, feedback or other forms or social media). If you are a subscribed user, we will also collect your user preferences, such as the types of articles you would like to read.

Information from third parties (such as, from your employer or LinkedIn): We may also receive information about you from third party sources. For example, your employer may provide your information to us, such as in connection with an article submitted by your employer for publication. If you choose to use LinkedIn to subscribe to our Website and Services, we also collect information related to your LinkedIn account and profile.

Your interactions with our Website and Services: As is true of most websites, we gather certain information automatically. This information includes IP addresses, browser type, Internet service provider (ISP), referring/exit pages, operating system, date/time stamp and clickstream data. We use this information to analyze trends, to administer the Website and our Services, to improve the content and performance of our Website and Services, and to track users' movements around the site. We may also link this automatically-collected data to personal information, for example, to inform authors about who has read their articles. Some of this data is collected through information sent by your web browser. We also use cookies and other tracking technologies to collect this information. To learn more about cookies and other tracking technologies that JD Supra may use on our Website and Services please see our "Cookies Guide" page.

How do we use this information?

We use the information and data we collect principally in order to provide our Website and Services. More specifically, we may use your personal information to:

  • Operate our Website and Services and publish content;
  • Distribute content to you in accordance with your preferences as well as to provide other notifications to you (for example, updates about our policies and terms);
  • Measure readership and usage of the Website and Services;
  • Communicate with you regarding your questions and requests;
  • Authenticate users and to provide for the safety and security of our Website and Services;
  • Conduct research and similar activities to improve our Website and Services; and
  • Comply with our legal and regulatory responsibilities and to enforce our rights.

How is your information shared?

  • Content and other public information (such as an author profile) is shared on our Website and Services, including via email digests and social media feeds, and is accessible to the general public.
  • If you choose to use our Website and Services to communicate directly with a company or individual, such communication may be shared accordingly.
  • Readership information is provided to publishing law firms and authors of content to give them insight into their readership and to help them to improve their content.
  • Our Website may offer you the opportunity to share information through our Website, such as through Facebook's "Like" or Twitter's "Tweet" button. We offer this functionality to help generate interest in our Website and content and to permit you to recommend content to your contacts. You should be aware that sharing through such functionality may result in information being collected by the applicable social media network and possibly being made publicly available (for example, through a search engine). Any such information collection would be subject to such third party social media network's privacy policy.
  • Your information may also be shared to parties who support our business, such as professional advisors as well as web-hosting providers, analytics providers and other information technology providers.
  • Any court, governmental authority, law enforcement agency or other third party where we believe disclosure is necessary to comply with a legal or regulatory obligation, or otherwise to protect our rights, the rights of any third party or individuals' personal safety, or to detect, prevent, or otherwise address fraud, security or safety issues.
  • To our affiliated entities and in connection with the sale, assignment or other transfer of our company or our business.

How We Protect Your Information

JD Supra takes reasonable and appropriate precautions to insure that user information is protected from loss, misuse and unauthorized access, disclosure, alteration and destruction. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. You should keep in mind that no Internet transmission is ever 100% secure or error-free. Where you use log-in credentials (usernames, passwords) on our Website, please remember that it is your responsibility to safeguard them. If you believe that your log-in credentials have been compromised, please contact us at privacy@jdsupra.com.

Children's Information

Our Website and Services are not directed at children under the age of 16 and we do not knowingly collect personal information from children under the age of 16 through our Website and/or Services. If you have reason to believe that a child under the age of 16 has provided personal information to us, please contact us, and we will endeavor to delete that information from our databases.

Links to Other Websites

Our Website and Services may contain links to other websites. The operators of such other websites may collect information about you, including through cookies or other technologies. If you are using our Website or Services and click a link to another site, you will leave our Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We are not responsible for the data collection and use practices of such other sites. This Policy applies solely to the information collected in connection with your use of our Website and Services and does not apply to any practices conducted offline or in connection with any other websites.

Information for EU and Swiss Residents

JD Supra's principal place of business is in the United States. By subscribing to our website, you expressly consent to your information being processed in the United States.

  • Our Legal Basis for Processing: Generally, we rely on our legitimate interests in order to process your personal information. For example, we rely on this legal ground if we use your personal information to manage your Registration Data and administer our relationship with you; to deliver our Website and Services; understand and improve our Website and Services; report reader analytics to our authors; to personalize your experience on our Website and Services; and where necessary to protect or defend our or another's rights or property, or to detect, prevent, or otherwise address fraud, security, safety or privacy issues. Please see Article 6(1)(f) of the E.U. General Data Protection Regulation ("GDPR") In addition, there may be other situations where other grounds for processing may exist, such as where processing is a result of legal requirements (GDPR Article 6(1)(c)) or for reasons of public interest (GDPR Article 6(1)(e)). Please see the "Your Rights" section of this Privacy Policy immediately below for more information about how you may request that we limit or refrain from processing your personal information.
  • Your Rights
    • Right of Access/Portability: You can ask to review details about the information we hold about you and how that information has been used and disclosed. Note that we may request to verify your identification before fulfilling your request. You can also request that your personal information is provided to you in a commonly used electronic format so that you can share it with other organizations.
    • Right to Correct Information: You may ask that we make corrections to any information we hold, if you believe such correction to be necessary.
    • Right to Restrict Our Processing or Erasure of Information: You also have the right in certain circumstances to ask us to restrict processing of your personal information or to erase your personal information. Where you have consented to our use of your personal information, you can withdraw your consent at any time.

You can make a request to exercise any of these rights by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
10 Liberty Ship Way, Suite 300
Sausalito, California 94965

You can also manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard.

We will make all practical efforts to respect your wishes. There may be times, however, where we are not able to fulfill your request, for example, if applicable law prohibits our compliance. Please note that JD Supra does not use "automatic decision making" or "profiling" as those terms are defined in the GDPR.

  • Timeframe for retaining your personal information: We will retain your personal information in a form that identifies you only for as long as it serves the purpose(s) for which it was initially collected as stated in this Privacy Policy, or subsequently authorized. We may continue processing your personal information for longer periods, but only for the time and to the extent such processing reasonably serves the purposes of archiving in the public interest, journalism, literature and art, scientific or historical research and statistical analysis, and subject to the protection of this Privacy Policy. For example, if you are an author, your personal information may continue to be published in connection with your article indefinitely. When we have no ongoing legitimate business need to process your personal information, we will either delete or anonymize it, or, if this is not possible (for example, because your personal information has been stored in backup archives), then we will securely store your personal information and isolate it from any further processing until deletion is possible.
  • Onward Transfer to Third Parties: As noted in the "How We Share Your Data" Section above, JD Supra may share your information with third parties. When JD Supra discloses your personal information to third parties, we have ensured that such third parties have either certified under the EU-U.S. or Swiss Privacy Shield Framework and will process all personal data received from EU member states/Switzerland in reliance on the applicable Privacy Shield Framework or that they have been subjected to strict contractual provisions in their contract with us to guarantee an adequate level of data protection for your data.

California Privacy Rights

Pursuant to Section 1798.83 of the California Civil Code, our customers who are California residents have the right to request certain information regarding our disclosure of personal information to third parties for their direct marketing purposes.

You can make a request for this information by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
10 Liberty Ship Way, Suite 300
Sausalito, California 94965

Some browsers have incorporated a Do Not Track (DNT) feature. These features, when turned on, send a signal that you prefer that the website you are visiting not collect and use data regarding your online searching and browsing activities. As there is not yet a common understanding on how to interpret the DNT signal, we currently do not respond to DNT signals on our site.

Access/Correct/Update/Delete Personal Information

For non-EU/Swiss residents, if you would like to know what personal information we have about you, you can send an e-mail to privacy@jdsupra.com. We will be in contact with you (by mail or otherwise) to verify your identity and provide you the information you request. We will respond within 30 days to your request for access to your personal information. In some cases, we may not be able to remove your personal information, in which case we will let you know if we are unable to do so and why. If you would like to correct or update your personal information, you can manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard. If you would like to delete your account or remove your information from our Website and Services, send an e-mail to privacy@jdsupra.com.

Changes in Our Privacy Policy

We reserve the right to change this Privacy Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our Privacy Policy will become effective upon posting of the revised policy on the Website. By continuing to use our Website and Services following such changes, you will be deemed to have agreed to such changes.

Contacting JD Supra

If you have any questions about this Privacy Policy, the practices of this site, your dealings with our Website or Services, or if you would like to change any of the information you have provided to us, please contact us at: privacy@jdsupra.com.

JD Supra Cookie Guide

As with many websites, JD Supra's website (located at www.jdsupra.com) (our "Website") and our services (such as our email article digests)(our "Services") use a standard technology called a "cookie" and other similar technologies (such as, pixels and web beacons), which are small data files that are transferred to your computer when you use our Website and Services. These technologies automatically identify your browser whenever you interact with our Website and Services.

How We Use Cookies and Other Tracking Technologies

We use cookies and other tracking technologies to:

  1. Improve the user experience on our Website and Services;
  2. Store the authorization token that users receive when they login to the private areas of our Website. This token is specific to a user's login session and requires a valid username and password to obtain. It is required to access the user's profile information, subscriptions, and analytics;
  3. Track anonymous site usage; and
  4. Permit connectivity with social media networks to permit content sharing.

There are different types of cookies and other technologies used our Website, notably:

  • "Session cookies" - These cookies only last as long as your online session, and disappear from your computer or device when you close your browser (like Internet Explorer, Google Chrome or Safari).
  • "Persistent cookies" - These cookies stay on your computer or device after your browser has been closed and last for a time specified in the cookie. We use persistent cookies when we need to know who you are for more than one browsing session. For example, we use them to remember your preferences for the next time you visit.
  • "Web Beacons/Pixels" - Some of our web pages and emails may also contain small electronic images known as web beacons, clear GIFs or single-pixel GIFs. These images are placed on a web page or email and typically work in conjunction with cookies to collect data. We use these images to identify our users and user behavior, such as counting the number of users who have visited a web page or acted upon one of our email digests.

JD Supra Cookies. We place our own cookies on your computer to track certain information about you while you are using our Website and Services. For example, we place a session cookie on your computer each time you visit our Website. We use these cookies to allow you to log-in to your subscriber account. In addition, through these cookies we are able to collect information about how you use the Website, including what browser you may be using, your IP address, and the URL address you came from upon visiting our Website and the URL you next visit (even if those URLs are not on our Website). We also utilize email web beacons to monitor whether our emails are being delivered and read. We also use these tools to help deliver reader analytics to our authors to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

Analytics/Performance Cookies. JD Supra also uses the following analytic tools to help us analyze the performance of our Website and Services as well as how visitors use our Website and Services:

  • HubSpot - For more information about HubSpot cookies, please visit legal.hubspot.com/privacy-policy.
  • New Relic - For more information on New Relic cookies, please visit www.newrelic.com/privacy.
  • Google Analytics - For more information on Google Analytics cookies, visit www.google.com/policies. To opt-out of being tracked by Google Analytics across all websites visit http://tools.google.com/dlpage/gaoptout. This will allow you to download and install a Google Analytics cookie-free web browser.

Facebook, Twitter and other Social Network Cookies. Our content pages allow you to share content appearing on our Website and Services to your social media accounts through the "Like," "Tweet," or similar buttons displayed on such pages. To accomplish this Service, we embed code that such third party social networks provide and that we do not control. These buttons know that you are logged in to your social network account and therefore such social networks could also know that you are viewing the JD Supra Website.

Controlling and Deleting Cookies

If you would like to change how a browser uses cookies, including blocking or deleting cookies from the JD Supra Website and Services you can do so by changing the settings in your web browser. To control cookies, most browsers allow you to either accept or reject all cookies, only accept certain types of cookies, or prompt you every time a site wishes to save a cookie. It's also easy to delete cookies that are already saved on your device by a browser.

The processes for controlling and deleting cookies vary depending on which browser you use. To find out how to do so with a particular browser, you can use your browser's "Help" function or alternatively, you can visit http://www.aboutcookies.org which explains, step-by-step, how to control and delete cookies in most browsers.

Updates to This Policy

We may update this cookie policy and our Privacy Policy from time-to-time, particularly as technology changes. You can always check this page for the latest version. We may also notify you of changes to our privacy policy by email.

Contacting JD Supra

If you have any questions about how we use cookies and other tracking technologies, please contact us at: privacy@jdsupra.com.

- hide

This website uses cookies to improve user experience, track anonymous site usage, store authorization tokens and permit sharing on social media networks. By continuing to browse this website you accept the use of cookies. Click here to read more about how we use cookies.