The second 20-Year Transmission Outlook (2024 Outlook), a planning exercise issued by the California Independent System Operator (CAISO) on July 31, identifies the transmission upgrades and additions needed to connect a...more
On January 31, 2022, the California Independent System Operator (CAISO) issued its first ever 20-year draft transmission outlook, which identifies $30.5 billion in long-term infrastructure upgrades and build-outs needed to...more
2/21/2022
/ CAISO ,
California Energy Commission ,
Carbon Emissions ,
Clean Energy ,
CPUC ,
Energy Projects ,
Energy Sector ,
Energy Storage ,
Power Infrastructure ,
Renewable Energy ,
Transmission Grid