The second 20-Year Transmission Outlook (2024 Outlook), a planning exercise issued by the California Independent System Operator (CAISO) on July 31, identifies the transmission upgrades and additions needed to connect a...more
In its Draft 2022–2023 Transmission Plan, the California Independent System Operator (CAISO) introduces a shift to more “strategic and proactive” transmission planning, with a goal of aligning the sites of future new...more
On June 30, California Governor Gavin Newsom signed Assembly Bill 205, a legislative effort to bolster the state’s energy resources and avoid outages like those California experienced in August 2020. AB 205 creates a...more
On January 31, 2022, the California Independent System Operator (CAISO) issued its first ever 20-year draft transmission outlook, which identifies $30.5 billion in long-term infrastructure upgrades and build-outs needed to...more
2/21/2022
/ CAISO ,
California Energy Commission ,
Carbon Emissions ,
Clean Energy ,
CPUC ,
Energy Projects ,
Energy Sector ,
Energy Storage ,
Power Infrastructure ,
Renewable Energy ,
Transmission Grid