The District Department of the Environment (DDOE) finalized its rulemaking on Stormwater Management, and Soil Erosion and Sediment Control (Stormwater Rules) on July 19, 2013. The Stormwater Rules, which were issued in order to comply with requirements contained in the District's Municipal Separate Storm Sewer System (MS4) permit,1 seek to reduce the runoff of stormwater from impervious surfaces in the District into its waterways. Given its central role in effectuating this new regulatory regime, the development community should expect to face new planning, design and construction requirements, as well as additional operational expenses over the life cycle of new development and renovation projects. Other states and jurisdictions across the country may choose to issue rules similar to those in the District.

The Stormwater Rules will be phased in over the next two years to apply to regulated projects as follows:

Notable aspects of the Stormwater Rules include:

  • requirements for certain new developments and renovation projects to retain substantial volumes of stormwater on-site using a combination of approved best management practices (BMPs); up to half of these retention requirements can be achieved through the payment of an in-lieu fee to DDOE or the purchase of stormwater retention credits
  • creation of a novel Stormwater Retention Credit Trading Program, through which credits can be bought and sold on an open market until they are used by regulated projects to comply with applicable retention requirements
  • new required practices to minimize soil erosion and sediment runoff at construction sites
  • the requirement to designate a certified "responsible person," who will be responsible for inspecting for erosion and sedimentation issues and working with DDOE to resolve those issues as they arise

Stormwater Retention Requirements

The Stormwater Rules will reduce stormwater runoff primarily by requiring major regulated projects to capture and retain substantial volumes of stormwater that would otherwise be diverted into the District's local waterways. Two types of major regulated projects will be subject to these stormwater retention requirements:

  • Major Land Disturbing Activities. Sites that disturb 5,000 square feet or more of land will be required to retain the quantity of stormwater that would result from a 1.2 inch rainfall.2
  • Major Substantial Improvement Activities. Renovation projects in existing structures with a combined footprint of 5,000 square feet for which the project costs exceed 50 percent of the structure's assessed value, will be required to retain the quantity of stormwater that would result from a 0.8 inch rainfall.3

A given site's stormwater retention requirement is commonly referred to as its stormwater retention volume (SWRv). Sites must achieve at least half of their SWRv using on-site retention infrastructure, while the remainder can be achieved using certain off-site retention mechanisms (described below).

Stormwater may be retained on-site using any combination of 13 approved BMPs. Approved BMPs include green roofs, rainwater harvesting, impervious surface disconnections, permeable pavement, bioretention, infiltration, ponding and wetland development. Each BMP is subject to detailed design, construction and landscaping criteria, which are set forth in the accompanying Stormwater Management Guidebook.4

Although major regulated projects will be able to achieve their applicable SWRv using any combination of these approved BMPs, many of them may not be suitable in certain common development contexts. For example, high-density developments that extend from lot line to lot line will not be able to incorporate surface BMPs, such as ponding or wetland retention. Additionally, major substantial improvement activities may be limited by space and load restrictions that could preclude the use of certain BMPs, such as heavy green roofs or large rainwater harvesting cisterns. However, regardless of which specific BMPs they select, all major regulated projects should expect stormwater retention infrastructure to become an integral component in the building's design, construction and operations.  

Major regulated projects may apply for relief from the applicable on-site SWRv requirement based on the existence of extraordinarily difficult site conditions that make achieving the SWRv technically infeasible or environmentally harmful.5 Evidence of such extraordinarily difficult site conditions could include:

  • soil and groundwater contamination
  • data from percolation testing
  • the presence of utilities requiring impermeable protections or a setback
  • restrictions having the force of law that affect the site,
  • evidence that installation of a BMP would conflict, in certain circumstances, with the terms of (1) a concept review by the Historic Preservation Review Board, (2) a concept review by the Commission on Fine Arts, (3) a design submission by the National Capital Planning Commission, (4) a variance or special exception from the Board of Zoning Adjustment, or (5) a large tract review by the District Office of Planning

Regulated projects located in certain areas are subject to unique stormwater retention requirements:

  • Major Land Disturbing Activities in the PROW. Major land disturbing activities consisting of bridge, roadway and streetscape projects located in the existing public right of way (PROW) are subject to applicable stormwater retention requirements only to the maximum extent practicable (MEP). This is achieved when each opportunity for installing stormwater retention capacity has been exhausted.6
  • Anacostia Waterfront Development Zone Sites. Sites located in the Anacostia Waterfront Development Zone that are publicly owned or publicly financed (AWDZ sites) are required to treat a water quality treatment volume (WQTv) equal to the difference between the stormwater runoff that would result from a 1.7 inch rainfall and the applicable SWRv. Additionally, the SWRv for major substantial improvement activities in the AWDZ is 1 inch, rather than the 0.8 inches applicable elsewhere in the District.7

Off-Site Stormwater Retention

In possibly the most novel aspect of the Stormwater Rules, DDOE will allow major regulated projects to achieve up to half of their applicable SWRv through off-site retention, either by payment of an in-lieu fee or purchase and submission of stormwater retention credits (SRCs, or credits).

  • Payment of In-Lieu Fees. The in-lieu fee represents the full life cycle cost of retaining one gallon of stormwater for one year.8 The in-lieu fee will initially be set at $3.50/gallon/year, and will be adjusted for inflation annually, based on the Urban Consumer Price Index.9 All in-lieu fees are to be deposited into a special purpose revenue fund administered by DDOE and shall be used solely to fund the design, development and maintenance of stormwater retention facilities within the District, among other related costs.10
  • Purchase and Submission of Stormwater Retention Credits. Stormwater retention credits enable regulated sites to offset a given volume of on-site retention capacity with an equal volume of off-site retention capacity, to be located elsewhere in the District. Each credit represents the offset of one gallon of retention capacity for a period of one year.11 Credits can be based on (1) new stormwater retention capacity developed after the Stormwater Rules were finalized, or (2) existing stormwater retention capacity developed since May 1, 2009.12 This capacity must not otherwise be required for compliance with other stormwater management obligations or the facility's applicable SWRv requirement. Facilities can only generate credits based on their initial 1.7 inches-worth of retention capacity. Upon certification by DDOE, credits can be sold to any interested buyer through the SRC Trading Program. Credits do not expire and there is no limit on how long credits can be banked or how frequently they can be bought and sold. By purchasing credits and submitting them to DDOE, major regulated projects can satisfy a portion of their applicable SWRv.

Stormwater Retention Credit Trading Program

DDOE has indicated that the SRC Trading Program will be structured as a modified over-the-counter (OTC) market, whereby buyers and sellers will negotiate individual transactions directly with each other; however, DDOE does have authority to review and approve proposed transactions.13 DDOE has indicated that it will make a registry of current credit owners publicly available to prospective purchasers, as well as certain transactional data, including the credit volumes and prices of completed transactions. DDOE has also indicated that it will facilitate transactions hosting periodic meetings of prospective purchasers and sellers.14

Throughout this rulemaking, DDOE has touted the use of credits and the associated trading program as a highly innovative solution to the problem of stormwater retention. However, with innovation comes great uncertainty, and indeed, many questions remain unanswered, including the following:

  • First, it remains unclear how large the credit market is likely to be. DDOE has indicated that there is sufficient existing eligible retention capacity to provide an initial supply of 4 million credits. However, this estimate is dependent on DDOE conducting substantial outreach to eligible buildings — an effort that, to date, it has not yet started.
  • Second, even by DDOE's own estimates, the anticipated demand for credits is highly uncertain. Indeed, DDOE's most recent public estimates are that potential demand for credits will be between 0.5 and 10.4 million in 2015, between 1 million and 15.6 million in 2016, and between 1.5 and 21 million in 2017.15
  • Third, without estimates of likely supply and demand, it is impossible to forecast credit prices with any degree of accuracy. DDOE has estimated that credit prices are likely to be no less than the cost to develop and maintain the underlying retention capacity and no more than the in-lieu fee — an initial range that DDOE estimates to be between $.94 and $3.50. However, it remains to be seen how high — and how volatile — prices will actually be.

Compounding these uncertainties, DDOE has not clarified exactly how heavily it intends to regulate the credit market. The development community has emphasized that DDOE's imposition of excessive regulatory burdens or delays would be harmful to the market's function; however, the exact degree to which DDOE will interfere with the free flow of credits in the market is still unknown.

Phased Implementation

The process by which the stormwater management regulations are to be implemented have been notably controversial throughout the rulemaking process. Under the District's MS4 permit, the Stormwater Rules were required to be finalized no later than July 22, 2013. Environmental advocates have argued that the stormwater management regulations should be implemented in full immediately upon finalization. By contrast, the development community cautioned that such hasty implementation would be detrimental to numerous regulated projects currently under development, since forcing them to effectively restart the planning and design phases would impose significant additional costs that could scuttle the entire project. Recognizing that much of the planned stormwater retention will depend upon supporting continued development subject to the more stringent regulations, DDOE will implement the stormwater management regulations according to a two-year transition plan, to proceed in the following phases:16

  • Transition Period 1. During the first transition period, major regulated projects will be grandfathered under the old regulations. This transition period will extend from July 19, 2013, until January 15, 2014.
  • Transition Period 2. During the second transition period, major regulated projects will be subject to the new stormwater management regulations, except for the 50 percent minimum on-site retention requirement, such that they will be able to achieve their entire SWRv using off-site retention through a combination of in-lieu fee payments and SRCs. Also during this period, projects subject to a conflicting regulatory approval can apply for relief from extraordinarily difficult site conditions. This period will extend from January 15, 2014, until January 15, 2015, for major land disturbing activities and until July 14, 2015, for major substantial improvement activities.
  • Full Implementation. After the conclusion of the second transition period, the new stormwater management regulations will become fully effective for all regulated projects.

Throughout this phased implementation, major regulated projects will qualify for each phase based on the timing of the submission of a stormwater management plan as part of a complete building permit application.17

Soil Erosion and Sediment Control

Responsible Personnel

All sites disturbing more than 5,000 square feet of land area shall designate a "responsible person," who shall ensure that all activities at the site are in compliance with the soil erosion and sediment control regulations, inspect the site periodically and after rainfall events for potential or actual instances of erosion, and be available to respond to potential or actual erosion issues and speak on site with DDOE staff as necessary.18 Individuals licensed in the District as a geotechnical engineer, land surveyor, or architect can serve as responsible personnel without any additional certification. Other individuals can serve as responsible personnel upon certification by an approved course on erosion control.19 However, to date, DDOE has not approved any such courses. It thus remains to be seen how difficult obtaining certification will be.

Soil Erosion and Sediment Control Restrictions

The Stormwater Rules contain a range of new restrictions on a variety of projects to reduce the soil erosion and sediment runoff that could ultimately flow to the District’s waterways:

  • Land-Disturbing Sites Over 5,000 Square Feet. every project involving land-disturbing activities must submit a soil erosion and sediment control (SESC) plan to DDOE for approval.20 SESC plans must address a variety of considerations, including (1) the existing and proposed topography of the site, (2) proposed grading activities, (3) provisions for storm drainage, (4) provisions to minimize on-site erosion and prevent offsite sedimentation, (5) the planned sequence of construction, and (6) recommendations of a professional engineer regarding areas with unstable soils, among other issues.21 Additionally, sites disturbing more than 5,000 square feet of land area shall also adhere to the Stormwater Pollution Prevention Plan that is provided in the Stormwater Management Guidebook.22
  • Roadway Projects. Roadway projects awaiting installation of utilities and pavement shall install interceptor dikes and other controls at regular intervals along the roadway, as well as diversion infrastructure to carry runoff down cut-and-fill slopes to an approved outlet. Roadway projects must also install permanent drainage infrastructure upon completion of rough grading.23
  • Demolition Projects. Projects involving demolition, razing, or other activities likely to result in the escape of dust, debris, and other sediments from the site must adopt measures to minimize stormwater erosion, maximize the preservation of natural vegetation and install perimeter dikes, as necessary. Notably, such projects near District waterways must avoid disturbing land within a 25-foot buffer of the waterway, subject to certain limited exceptions.24
  • Underground Utility Projects. Underground utility projects will be prohibited from exposing more than 500 linear feet of open trench at any one time, restrict the placement of excavated material during the project, and mandate the installation of interim and permanent stabilization upon completion of the project and refilling of the trench.25

Implementation

As DDOE now transitions to implementation of the Stormwater Rules, it will have to address a number of crucial issues that remain unresolved or may prove to be infeasible once they are put into practice. A few specific issues that will have to be addressed during the initial implementation phases include:

  • Selection of Approved BMPs. Although DDOE has approved 13 distinct BMPs, it is not clear how many of these choices will be effectively available to any given project. Some projects may be subject to space and load bearing limitations, while others may face economic constraints that restrict the use of costly technologies. Other BMPs simply remain untested as to their utility, durability and maintenance costs, thus they are likely to be avoided by planners and builders. If major regulated projects are unable to achieve the applicable SWRv using the currently approved BMPs, DDOE will have to work with the development community to identify and approve additional retention technologies.
  • Major Substantial Improvement Activities. The Stormwater Rules do not address a variety of issues specifically applicable to major substantial improvement activities, which are expected to face particular difficulties in complying with the stormwater management requirements. For example, it is not clear how renovations on multi-building campuses, such as the District's hospitals and universities, are to be calculated. It is also not clear the extent to which buildings undergoing major substantial improvement activities will have to conduct otherwise unnecessary renovations simply to accommodate the required stormwater retention capacity. Overly onerous requirements could deter property owners from improving their buildings, and DDOE may need to provide additional accommodations if the Stormwater Rules prove to be infeasible or counterproductive.
  • Use of In-Lieu Fee Funds. Although the Stormwater Rules clearly require DDOE to use in-lieu fees solely for the development and maintenance of additional stormwater retention capacity in the District, it is not clear where those facilities will be located, and whether they will compete for space with other facilities that would otherwise be used to generate credits. Excessive competition between credit-generating facilities and those maintained using in-lieu fees could inadvertently sabotage the Credit Trading Program entirely, and it will be DDOE's responsibility to find a balanced approach.
  • Size and Liquidity of the Credit Market. Numerous issues that will substantially affect the Credit Trading Program's overall success remain unresolved. Specific issues relate to the initial supply of credits, the actual cost to develop and maintain stormwater retention facilities to generate credits, and the overall size and volatility of the credit market. These issues will likely remain unresolved until the Credit Trading Program is fully operational.
  • Structure of Credit Transactions. Because the Credit Trading Program will be structured as an over-the-counter market, there is substantial uncertainty surrounding how easily prospective credit purchasers and sellers will find each other and what terms their credit sales contracts will contain. DDOE has indicated that it will publicize a register of current credit owners and convene a working group to develop model sales contracts. Moreover, the degree to which DDOE will impose onerous and lengthy credit certifications and transaction approvals remains to be seen.
  • Relationship with Other Stormwater Initiatives. The Stormwater Rules represent just one of the District's ongoing efforts to address the quality of its waterways. In February 2013, Mayor Gray issued the Sustainable DC Plan, under which all of the District's waterways are intended to be suitable for fishing and swimming, and 75 percent of the District's land area is intended to be capable of capturing or filtering stormwater for reuse by 2032.26 More recently, DDOE has also promulgated rules for its new Stormwater Fee Discount Program.27 Managing these programs and initiatives will require careful coordination by DDOE over the coming months.

Conclusion

Despite the many uncertainties surrounding the implementation of the Stormwater Rules, it is increasingly clear that stormwater management is an issue of growing concern for many jurisdictions and one that members of the development community will have to seriously consider in future projects. Multiple states in the Chesapeake Bay watershed have established formal programs to reduce runoff, some of which include nutrient credit trading programs.28 Other states and local jurisdictions have begun imposing stormwater fees based on the extent of impervious areas.29 Planners, designers and other members of the development community should therefore expect stormwater management considerations to become an increasingly prominent aspect of their work on new development and major renovation projects for the foreseeable future.


Notes

1 EPA, NPDES Permit No. DC0000221 (Sept. 30, 2011), available at http://www.epa.gov/reg3wapd/npdes/dcpermits.htm.

2 Stormwater Rules, §520.3

3 Stormwater Rules, §522.4.

4 DDOE, Stormwater Management Guidebook, Chapter 3.

5 Stormwater Rule part 526.

6 Stormwater Rules, §521. 2.

7 Stormwater Rules, §524.5(b).

8 Stormwater Rules, §530.1.

9 Stormwater Rules, §530.2.

10 Stormwater Rules, §530.6.

11 Stormwater Rules, §531.3. Note that AWDZ sites will be required to submit 1.25 credits for every gallon of off-site retention. Stormwater Rules, §524.8.

12 Stormwater Rules, §534.1.

13 Stormwater Rules, §533.3.

14 DDOE, Notice of Proposed Rulemaking on Stormwater Management, and Soil Erosion and Sediment Control, 60 DC Reg. 8,493, 8,509 (Jun. 7, 2013) (hereinafter, Stormwater Second Proposed Rules).

15 Stormwater Second Proposed Rules, at 8,511.

16 Stormwater Rules, Part 552.

17 Note that the Stormwater Rules provide exceptions to this for two types of projects. First, areas of projects for which an "advanced design" has been submitted and for which approval has not expired shall comply with the requirements in place at the time of the submittal. Second, areas of multi-phased projects for which all stormwater infrastructure for all phases have been installed in compliance with a DDOE-approved stormwater management plan during an earlier phase of construction shall be deemed to have met the stormwater management requirements.

18 Stormwater Rules, §547.2.

19 Stormwater Rules, §547.3.

20 Stormwater Rules, §540.1.

21 Stormwater Rules, §542.9.

22 Stormwater Rules, §543.10.

23 Stormwater Rules, §544.3.

24 Stormwater Rules, §545.5.

25 Stormwater Rules, §546.1.

26 DC Sustainability Plan at 99-103 (Feb. 20, 2013).

27 DDOE, Notice of Final Rulemaking on Stormwater Fee Discount Program, 60 DC Reg. 10,732 (July 19, 2013).

28 Both Maryland and Virginia, among other states, administer nutrient credit trading programs to limit runoff into the Chesapeake Bay. Information regarding Maryland's program is available at mdnutrienttrading.org. Information regarding Virginia's program is available here.

29 In Maryland, all local jurisdictions in the state were required to implement a stormwater fee no later than July 1, 2013. Similar fees based on impervious land areas have also been adopted in Philadelphia, Pa.; Minneapolis, Minn.; and Richmond, Va.; and all local jurisdictions in North Carolina, among many others.

DISCLAIMER: Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© Holland & Knight LLP | Attorney Advertising

Written by:

Holland & Knight LLP
Contact
more
less

Holland & Knight LLP on:

Readers' Choice 2017
Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Custom Email Digest
- hide

JD Supra Privacy Policy

Updated: May 25, 2018:

JD Supra is a legal publishing service that connects experts and their content with broader audiences of professionals, journalists and associations.

This Privacy Policy describes how JD Supra, LLC ("JD Supra" or "we," "us," or "our") collects, uses and shares personal data collected from visitors to our website (located at www.jdsupra.com) (our "Website") who view only publicly-available content as well as subscribers to our services (such as our email digests or author tools)(our "Services"). By using our Website and registering for one of our Services, you are agreeing to the terms of this Privacy Policy.

Please note that if you subscribe to one of our Services, you can make choices about how we collect, use and share your information through our Privacy Center under the "My Account" dashboard (available if you are logged into your JD Supra account).

Collection of Information

Registration Information. When you register with JD Supra for our Website and Services, either as an author or as a subscriber, you will be asked to provide identifying information to create your JD Supra account ("Registration Data"), such as your:

  • Email
  • First Name
  • Last Name
  • Company Name
  • Company Industry
  • Title
  • Country

Other Information: We also collect other information you may voluntarily provide. This may include content you provide for publication. We may also receive your communications with others through our Website and Services (such as contacting an author through our Website) or communications directly with us (such as through email, feedback or other forms or social media). If you are a subscribed user, we will also collect your user preferences, such as the types of articles you would like to read.

Information from third parties (such as, from your employer or LinkedIn): We may also receive information about you from third party sources. For example, your employer may provide your information to us, such as in connection with an article submitted by your employer for publication. If you choose to use LinkedIn to subscribe to our Website and Services, we also collect information related to your LinkedIn account and profile.

Your interactions with our Website and Services: As is true of most websites, we gather certain information automatically. This information includes IP addresses, browser type, Internet service provider (ISP), referring/exit pages, operating system, date/time stamp and clickstream data. We use this information to analyze trends, to administer the Website and our Services, to improve the content and performance of our Website and Services, and to track users' movements around the site. We may also link this automatically-collected data to personal information, for example, to inform authors about who has read their articles. Some of this data is collected through information sent by your web browser. We also use cookies and other tracking technologies to collect this information. To learn more about cookies and other tracking technologies that JD Supra may use on our Website and Services please see our "Cookies Guide" page.

How do we use this information?

We use the information and data we collect principally in order to provide our Website and Services. More specifically, we may use your personal information to:

  • Operate our Website and Services and publish content;
  • Distribute content to you in accordance with your preferences as well as to provide other notifications to you (for example, updates about our policies and terms);
  • Measure readership and usage of the Website and Services;
  • Communicate with you regarding your questions and requests;
  • Authenticate users and to provide for the safety and security of our Website and Services;
  • Conduct research and similar activities to improve our Website and Services; and
  • Comply with our legal and regulatory responsibilities and to enforce our rights.

How is your information shared?

  • Content and other public information (such as an author profile) is shared on our Website and Services, including via email digests and social media feeds, and is accessible to the general public.
  • If you choose to use our Website and Services to communicate directly with a company or individual, such communication may be shared accordingly.
  • Readership information is provided to publishing law firms and authors of content to give them insight into their readership and to help them to improve their content.
  • Our Website may offer you the opportunity to share information through our Website, such as through Facebook's "Like" or Twitter's "Tweet" button. We offer this functionality to help generate interest in our Website and content and to permit you to recommend content to your contacts. You should be aware that sharing through such functionality may result in information being collected by the applicable social media network and possibly being made publicly available (for example, through a search engine). Any such information collection would be subject to such third party social media network's privacy policy.
  • Your information may also be shared to parties who support our business, such as professional advisors as well as web-hosting providers, analytics providers and other information technology providers.
  • Any court, governmental authority, law enforcement agency or other third party where we believe disclosure is necessary to comply with a legal or regulatory obligation, or otherwise to protect our rights, the rights of any third party or individuals' personal safety, or to detect, prevent, or otherwise address fraud, security or safety issues.
  • To our affiliated entities and in connection with the sale, assignment or other transfer of our company or our business.

How We Protect Your Information

JD Supra takes reasonable and appropriate precautions to insure that user information is protected from loss, misuse and unauthorized access, disclosure, alteration and destruction. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. You should keep in mind that no Internet transmission is ever 100% secure or error-free. Where you use log-in credentials (usernames, passwords) on our Website, please remember that it is your responsibility to safeguard them. If you believe that your log-in credentials have been compromised, please contact us at privacy@jdsupra.com.

Children's Information

Our Website and Services are not directed at children under the age of 16 and we do not knowingly collect personal information from children under the age of 16 through our Website and/or Services. If you have reason to believe that a child under the age of 16 has provided personal information to us, please contact us, and we will endeavor to delete that information from our databases.

Links to Other Websites

Our Website and Services may contain links to other websites. The operators of such other websites may collect information about you, including through cookies or other technologies. If you are using our Website or Services and click a link to another site, you will leave our Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We are not responsible for the data collection and use practices of such other sites. This Policy applies solely to the information collected in connection with your use of our Website and Services and does not apply to any practices conducted offline or in connection with any other websites.

Information for EU and Swiss Residents

JD Supra's principal place of business is in the United States. By subscribing to our website, you expressly consent to your information being processed in the United States.

  • Our Legal Basis for Processing: Generally, we rely on our legitimate interests in order to process your personal information. For example, we rely on this legal ground if we use your personal information to manage your Registration Data and administer our relationship with you; to deliver our Website and Services; understand and improve our Website and Services; report reader analytics to our authors; to personalize your experience on our Website and Services; and where necessary to protect or defend our or another's rights or property, or to detect, prevent, or otherwise address fraud, security, safety or privacy issues. Please see Article 6(1)(f) of the E.U. General Data Protection Regulation ("GDPR") In addition, there may be other situations where other grounds for processing may exist, such as where processing is a result of legal requirements (GDPR Article 6(1)(c)) or for reasons of public interest (GDPR Article 6(1)(e)). Please see the "Your Rights" section of this Privacy Policy immediately below for more information about how you may request that we limit or refrain from processing your personal information.
  • Your Rights
    • Right of Access/Portability: You can ask to review details about the information we hold about you and how that information has been used and disclosed. Note that we may request to verify your identification before fulfilling your request. You can also request that your personal information is provided to you in a commonly used electronic format so that you can share it with other organizations.
    • Right to Correct Information: You may ask that we make corrections to any information we hold, if you believe such correction to be necessary.
    • Right to Restrict Our Processing or Erasure of Information: You also have the right in certain circumstances to ask us to restrict processing of your personal information or to erase your personal information. Where you have consented to our use of your personal information, you can withdraw your consent at any time.

You can make a request to exercise any of these rights by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
10 Liberty Ship Way, Suite 300
Sausalito, California 94965

You can also manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard.

We will make all practical efforts to respect your wishes. There may be times, however, where we are not able to fulfill your request, for example, if applicable law prohibits our compliance. Please note that JD Supra does not use "automatic decision making" or "profiling" as those terms are defined in the GDPR.

  • Timeframe for retaining your personal information: We will retain your personal information in a form that identifies you only for as long as it serves the purpose(s) for which it was initially collected as stated in this Privacy Policy, or subsequently authorized. We may continue processing your personal information for longer periods, but only for the time and to the extent such processing reasonably serves the purposes of archiving in the public interest, journalism, literature and art, scientific or historical research and statistical analysis, and subject to the protection of this Privacy Policy. For example, if you are an author, your personal information may continue to be published in connection with your article indefinitely. When we have no ongoing legitimate business need to process your personal information, we will either delete or anonymize it, or, if this is not possible (for example, because your personal information has been stored in backup archives), then we will securely store your personal information and isolate it from any further processing until deletion is possible.
  • Onward Transfer to Third Parties: As noted in the "How We Share Your Data" Section above, JD Supra may share your information with third parties. When JD Supra discloses your personal information to third parties, we have ensured that such third parties have either certified under the EU-U.S. or Swiss Privacy Shield Framework and will process all personal data received from EU member states/Switzerland in reliance on the applicable Privacy Shield Framework or that they have been subjected to strict contractual provisions in their contract with us to guarantee an adequate level of data protection for your data.

California Privacy Rights

Pursuant to Section 1798.83 of the California Civil Code, our customers who are California residents have the right to request certain information regarding our disclosure of personal information to third parties for their direct marketing purposes.

You can make a request for this information by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
10 Liberty Ship Way, Suite 300
Sausalito, California 94965

Some browsers have incorporated a Do Not Track (DNT) feature. These features, when turned on, send a signal that you prefer that the website you are visiting not collect and use data regarding your online searching and browsing activities. As there is not yet a common understanding on how to interpret the DNT signal, we currently do not respond to DNT signals on our site.

Access/Correct/Update/Delete Personal Information

For non-EU/Swiss residents, if you would like to know what personal information we have about you, you can send an e-mail to privacy@jdsupra.com. We will be in contact with you (by mail or otherwise) to verify your identity and provide you the information you request. We will respond within 30 days to your request for access to your personal information. In some cases, we may not be able to remove your personal information, in which case we will let you know if we are unable to do so and why. If you would like to correct or update your personal information, you can manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard. If you would like to delete your account or remove your information from our Website and Services, send an e-mail to privacy@jdsupra.com.

Changes in Our Privacy Policy

We reserve the right to change this Privacy Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our Privacy Policy will become effective upon posting of the revised policy on the Website. By continuing to use our Website and Services following such changes, you will be deemed to have agreed to such changes.

Contacting JD Supra

If you have any questions about this Privacy Policy, the practices of this site, your dealings with our Website or Services, or if you would like to change any of the information you have provided to us, please contact us at: privacy@jdsupra.com.

JD Supra Cookie Guide

As with many websites, JD Supra's website (located at www.jdsupra.com) (our "Website") and our services (such as our email article digests)(our "Services") use a standard technology called a "cookie" and other similar technologies (such as, pixels and web beacons), which are small data files that are transferred to your computer when you use our Website and Services. These technologies automatically identify your browser whenever you interact with our Website and Services.

How We Use Cookies and Other Tracking Technologies

We use cookies and other tracking technologies to:

  1. Improve the user experience on our Website and Services;
  2. Store the authorization token that users receive when they login to the private areas of our Website. This token is specific to a user's login session and requires a valid username and password to obtain. It is required to access the user's profile information, subscriptions, and analytics;
  3. Track anonymous site usage; and
  4. Permit connectivity with social media networks to permit content sharing.

There are different types of cookies and other technologies used our Website, notably:

  • "Session cookies" - These cookies only last as long as your online session, and disappear from your computer or device when you close your browser (like Internet Explorer, Google Chrome or Safari).
  • "Persistent cookies" - These cookies stay on your computer or device after your browser has been closed and last for a time specified in the cookie. We use persistent cookies when we need to know who you are for more than one browsing session. For example, we use them to remember your preferences for the next time you visit.
  • "Web Beacons/Pixels" - Some of our web pages and emails may also contain small electronic images known as web beacons, clear GIFs or single-pixel GIFs. These images are placed on a web page or email and typically work in conjunction with cookies to collect data. We use these images to identify our users and user behavior, such as counting the number of users who have visited a web page or acted upon one of our email digests.

JD Supra Cookies. We place our own cookies on your computer to track certain information about you while you are using our Website and Services. For example, we place a session cookie on your computer each time you visit our Website. We use these cookies to allow you to log-in to your subscriber account. In addition, through these cookies we are able to collect information about how you use the Website, including what browser you may be using, your IP address, and the URL address you came from upon visiting our Website and the URL you next visit (even if those URLs are not on our Website). We also utilize email web beacons to monitor whether our emails are being delivered and read. We also use these tools to help deliver reader analytics to our authors to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

Analytics/Performance Cookies. JD Supra also uses the following analytic tools to help us analyze the performance of our Website and Services as well as how visitors use our Website and Services:

  • HubSpot - For more information about HubSpot cookies, please visit legal.hubspot.com/privacy-policy.
  • New Relic - For more information on New Relic cookies, please visit www.newrelic.com/privacy.
  • Google Analytics - For more information on Google Analytics cookies, visit www.google.com/policies. To opt-out of being tracked by Google Analytics across all websites visit http://tools.google.com/dlpage/gaoptout. This will allow you to download and install a Google Analytics cookie-free web browser.

Facebook, Twitter and other Social Network Cookies. Our content pages allow you to share content appearing on our Website and Services to your social media accounts through the "Like," "Tweet," or similar buttons displayed on such pages. To accomplish this Service, we embed code that such third party social networks provide and that we do not control. These buttons know that you are logged in to your social network account and therefore such social networks could also know that you are viewing the JD Supra Website.

Controlling and Deleting Cookies

If you would like to change how a browser uses cookies, including blocking or deleting cookies from the JD Supra Website and Services you can do so by changing the settings in your web browser. To control cookies, most browsers allow you to either accept or reject all cookies, only accept certain types of cookies, or prompt you every time a site wishes to save a cookie. It's also easy to delete cookies that are already saved on your device by a browser.

The processes for controlling and deleting cookies vary depending on which browser you use. To find out how to do so with a particular browser, you can use your browser's "Help" function or alternatively, you can visit http://www.aboutcookies.org which explains, step-by-step, how to control and delete cookies in most browsers.

Updates to This Policy

We may update this cookie policy and our Privacy Policy from time-to-time, particularly as technology changes. You can always check this page for the latest version. We may also notify you of changes to our privacy policy by email.

Contacting JD Supra

If you have any questions about how we use cookies and other tracking technologies, please contact us at: privacy@jdsupra.com.

- hide

This website uses cookies to improve user experience, track anonymous site usage, store authorization tokens and permit sharing on social media networks. By continuing to browse this website you accept the use of cookies. Click here to read more about how we use cookies.