FERC Accelerates Efforts to Integrate Electric Storage Projects Into Jurisdictional Wholesale Markets

by Shearman & Sterling LLP
Contact

Over the past year, the Federal Energy Regulatory Commission (FERC) has accelerated its efforts to facilitate integration of electric storage projects into wholesale electricity markets subject to its jurisdiction.

Historically, electricity “storage” has consisted of hydroelectric pumped storage projects, which pump water to higher-level reservoirs when electricity demand is low, and allow it to flow downhill through electricity-generating turbines when demand increases.  However, over the past two decades, new electricity storage technologies have entered the market.  These technologies include batteries (lead acid, lithium ion, sodium sulfur, flow, dry cell); flywheels (mechanical devices that harness rotational energy to deliver instantaneous electricity); compressed air energy storage that uses electricity to compress air, then expand it through a turbine to generate electricity later; electrochemical capacitors that store electricity in an electrostatic charge; and thermal energy storage that either uses heat sinks like molten salts to store heat energy, which can either generate electricity or provide heating later, or uses electricity that can be used to freeze water into ice, which can be used to provide air conditioning later.

As defined by FERC, an “electric storage resource” is a resource “capable of receiving electric energy from the grid and storing it for later injection of electricity back to the grid regardless of where the resource is located on the electrical system.”

Within electricity markets, electric storage resources have provided bulk energy services, ancillary services (frequency regulation, energy management, backup power and load leveling), and transmission services (voltage support and grid stabilization).

In April 2016, FERC’s staff sent data requests to Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs).  These requests sought information about whether barriers exist to the participation of electric storage resources in the capacity, energy and ancillary services markets operated by the six FERC jurisdictional RTOs and ISOs that could lead to unjust and unreasonable rates for wholesale sales of electricity, which are prohibited by the Federal Power Act (FPA).  In addition, the staff wanted to know whether any changes to RTO and ISO tariffs are necessary if such barriers exist.   (See Energy Update, Vol. 3, Issue 3, September 2016).  FERC also convened a technical conference in November 2016 to discuss utilization of electric storage resources as transmission assets compensated through transmission rates, for grid support services that are compensated in other ways and for multiple services.

Following its review of the information obtained through the data request and technical conference, and prior to the inauguration of President Trump, FERC took two actions to increase the ability of electric storage resources to participate in wholesale electricity markets and clarified its policy with respect to the rates that may be charged by electric storage resources participating in wholesale markets.  In January 2017, FERC issued a Policy Statement giving guidance on the ability of electric storage resources to provide transmission or grid support services at cost-based rates while, at the same time, providing other services, such as power sales, at market-based rates.[1]  In mid-November 2016, FERC issued a Notice of Proposed Rulemaking (NOPR) to amend its regulations under the FPA and remove barriers that prevented electric storage resources and distributed energy resource aggregators to participate in the capacity, energy, and ancillary service markets operated by the six RTOs and ISOs subject to FERC jurisdiction.[2]  These RTOs and ISOs are NYISO, ISO-NE, PJM, MISO, SPP and CAISO.

FERC Policy Statement on Rates Charged by Electric Storage Resources

In its Policy Statement, FERC observed that electric storage resources can both charge and discharge electricity, provide multiple services and switch from providing one service to another almost instantaneously.  Based on these characteristics, FERC found that electric storage resources may fit into one or more of the traditional electricity asset functions of generation, transmission and distribution and, further, that an electric storage resource receiving cost-based rate recovery for providing one service also may be technically capable of providing other market-based rate services.

Section 205 of the FPA requires that the rates, terms and conditions of public utilities for the transmission or sale of electricity at wholesale in interstate commerce be on file with FERC, “just and reasonable” and not unduly discriminatory or preferential.  Cost-based rates allow a public utility to recover its costs of providing service, allocated among customer classes, and make a reasonable rate of return on its investment.  FERC authorizes market-based rates for wholesale sales of electric energy, capacity and ancillary services, where the utility demonstrates that it and its affiliates do not have or have mitigated market power in the relevant market(s), and for merchant transmission.

In the Policy Statement, FERC clarified that, as a matter of policy, an electric storage resource may provide services at both cost-based and market-based rates at the same time, so long as three issues are addressed:   the potential for double recovery of costs by the electric storage resource owner or operator to the detriment of cost-based ratepayers; the potential for cost recovery through cost-based rates to inappropriately suppress competitive prices in wholesale electric markets to the detriment of other competitors who do not receive such cost-based rate recovery; and the level of control in the operation of an electric storage resource by an RTO/ISO that could jeopardize its independence from market participants.

As part of its policy guidance, FERC clarified rulings and statements made in two prior orders addressing rates charged by electric storage resources.

With respect to the potential for double recovery of costs by the electric storage resource owner or operator, FERC clarified that, in addition to the approach it approved in its Western Grid order,[3] crediting any market revenues back to the cost-based ratepayers is one possible way to address potential double recovery of costs.  In Western Grid, FERC authorized Western Grid to charge cost-based transmission rates for the provision of voltage support and thermal overload services protection to CAISO because, among other things, Western Grid would operate the energy storage projects, at CAISO’s direction, only as transmission assets, and had committed to forego any sales into CAISO’s organized wholesale electric markets.

FERC also indicated that where crediting is utilized to address double recovery of costs, the amount of crediting may vary depending on how the cost-based rate recovery is structured.  In a case where the costs of an electric storage resource is recovered through cost-based rates, the electric storage resource owner or operator may credit all projected market revenues earned by the electric storage resource over a reasonable period of time (expected useful life of the asset or the term of the cost-based rate services).  Alternatively, the market-revenue off-set can be used to reduce the amount of the revenue requirement to be used in the development of the cost-based rate.

With respect to the second issue, the potential for cost recovery through cost-based rates to inappropriately suppress competitive prices in wholesale electric markets, FERC stated that it was “not convinced” by commenters’ arguments that allowing electric storage resources to receive concurrently cost- and market-based revenues for providing separate services will undermine competition or suppress market prices to subcompetitive levels.  Denying electric storage resources the opportunity to earn cost-based and market-based revenues on the theory that dual revenue streams undermine competition would require revisiting years of precedent allowing concurrently cost-based and market-based sales for reactive power and market-based rate wholesale sales, and for cost-based sales to captive wholesale requirements customers and off-system market-based rate sales.  FERC also said that the concern that electric storage resources would suppress market clearing prices by offering services for which they receive cost-based rates could be addressed by the manner in which the costs that are included in the cost-based rates are established.

With respect to the third issue, maintaining RTO/ISO independence from market participants, FERC clarified its previous conclusion in its Nevada Hydro[4] order that it would not be appropriate to require CAISO to assume “any level of operation control” over Nevada Hydro’s hydroelectric pumped storage project.  “There is nothing unreasonable about an RTO/ISO exercising some level of control over the resources it commits or dispatches where it can be shown that the RTO/ISO independence is not an issue,” FERC said.  In Nevada Hydro, FERC denied Nevada Hydro’s request to treat its pumped storage project as a transmission facility under the operational control of CAISO for rate recovery purposes.  FERC agreed with CAISO that under Nevada Hydro’s proposal, CAISO would have to decide when the LEAPS project would operate, how much energy it would provide and when it would operate the pumps to store water for future electricity generation, compromising CAISO’s independence.

FERC further stated that in order to ensure RTO/ISO independence, the provision of market-based rate service should be under the control of the electric storage resource owner or operator, rather than the RTO/ISO.  Where a service compensated though cost-based rates is needed, the RTO/ISO should give priority to the dispatch of the electric storage resource to address over the electric storage resource’s provision of market-based rate services.  Performance penalties could be imposed on the electric storage resource owner or operator for failure to perform at these times.

FERC NOPR on Participation by Electric Storage Resources in Wholesale Electricity Markets

In the NOPR, FERC found that, currently, resource participation in wholesale electric markets operated by RTOs and ISOs is governed by participation models consisting of market rules designed for different types of resources and technical requirements for market services that those resources are eligible to provide.  To address this, FERC proposed, among other things, to require each RTO/ISO to revise its tariff to include market rules that accommodate the participation of electric storage resources organized as wholesale electric markets, recognizing the physical and operational characteristics of electric storage resources.

Under the NOPR, RTO/ISO market rules would have to satisfy numerous requirements.

First, electric storage resources must be eligible to provide all capacity, energy and ancillary services that they are technically capable of providing.  With respect to this requirement, FERC also proposes that electric storage resources should be able to provide services that the RTOs/ISOs do not procure through a market mechanism, such as blackstart, primary frequency response and reactive power, if they are technically capable.  Where compensation for these services exists, electric storage resources also should receive such compensation commensurate with the services provided.  FERC proposes to require each RTO/ISO to revise its tariff to clarify that an electric storage resource may de-rate its capacity to meet minimum run-time requirements to provide capacity or other services.  RTOs/ISOs with capacity markets that de-rate capacity value for electric storage resources must be consistent with the quantity of energy required to be offered into the day-ahead energy markets for resources with capacity obligations.

Second, bidding parameters (the physical and operational constraints that a resource would identify when submitting offers to sell capacity, energy or ancillary services or bids to buy energy in wholesale electric markets) incorporated in the participation model must reflect and account for the physical and operational characteristics of electric storage resources.  With respect to this requirement, FERC explained that bidding parameters allow the RTO/ISO to model and dispatch the resource consistent with its operational constraints.  FERC found that by requiring electric storage resources to use bidding parameters developed for traditional generators or other supply resources, RTOs/ISOs may fail to effectively utilize these resources, possibly precluding electric storage resources from providing all of the services that they are physically and technically capable of providing.  FERC found that resource bidding parameters vary greatly between RTOs/ISOs.  Some require the same bidding parameters from all resources offering into a specific market, while others tie bidding parameters to specific participation models.  FERC proposed that the RTOs/ISOs establish state of charge, upper charge limit, lower charge limit, maximum energy charge rate and maximum energy discharge rate as bidding parameters for the participation model.  FERC proposes to require that RTO/ISO participation models include the four bidding parameters that market participants may submit, at their discretion, for their resource based on its physical constraints or desired operation:  minimum charge time, maximum charge time, minimum run time and maximum run time.  Where the RTO/ISO has reserved for itself the right to manage the state of charge of an electric storage resource, FERC proposes to require that the RTOs/ISOs allow electric storage resources to self-manage their state of charge and upper and lower charge limits.

Third, electric storage resources can be dispatched and set the wholesale market clearing prices as both a wholesale seller and a wholesale buyer consistent with existing rules that govern when a resource can set the wholesale price.  FERC proposed to require RTOs and ISOs to accept wholesale bids from electric storage resources to buy energy so that the economic preferences of these resources are fully integrated in the market; the electric storage resource can set the price as a load resource where market rules allow and can be available to the RTO/ISO as a dispatchable demand asset.  However, these requirements must not prohibit electric storage resources from participating in wholesale electric markets as price takers.

Fourth, the minimum size requirement for electric storage resources to participate in the organized wholesale electric market must not exceed 100 kW.  FERC concluded on a preliminary basis that such a minimum size requirement would balance the benefits of increased competition with the ability of RTO/ISO market clearing software to effectively model and dispatch smaller resources often located on the distribution system.  FERC proposed to require each RTO/ISO to revise its tariff to include a participation model for electric storage resources that establishes a minimum size requirement for participation in wholesale markets not exceeding 100 kW, including any minimum capacity requirements, minimum offer requirements and minimum bid requirements for resources participating in these markets under the electric storage resource participation model.

Fifth, the sale of energy from the organized wholesale electric markets to an electric storage resource that the resource then resells back to those markets must be at the wholesale locational marginal price (LMP).  With respect to this requirement, FERC states that it previously has found that the sale of energy from the grid that is used to charge electric storage resources for later resale constitutes a FERC jurisdictional wholesale sale and, as such, the just and reasonable rate for that sale is the RTO/ISO market’s wholesale price for energy, or LMP.  FERC observed that the manner in which an electric storage resource charges (consumes) and discharges (produces) energy will determine whether the electric storage resource is making a jurisdictional sale for resale.  In the NOPR, FERC proposes to require each RTO/ISO to revise its tariff to specify that the wholesale LMP is required for the sale of energy from wholesale electric markets to an electric storage resource that the resource then resells back to those markets.

Next Steps

Following its review of comments filed in response to the NOPR, FERC will decide whether to issue a Final Order implementing some or all of the proposals contained in the NOPR.  However, FERC cannot issue a Final Order until there is a quorum of Commissioners.  It is likely that when the full FERC considers any staff proposal with respect to a Final Order, only one FERC commissioner who voted on the NOPR will still be on the Commission.

Prior to losing its quorum in early February, FERC implemented some of its NOPR proposals in an order granting the request of Indianapolis Power & Light Company (IPL) that it find MISO’s tariff to be unjust, unreasonable and unduly discriminatory because it unnecessarily restricts competition by preventing electric storage resources from providing all the services that they are technically capable of providing, which could lead to unjust and unreasonable rates.[5]  IPL had argued that its Battery Facility, a grid-scale lithium ion battery-based energy storage system containing a 20 MW array of lithium ion cells, can provide nearly instantaneous primary frequency response and could become a “Load Modifying Resource” under MISO Tariff that could provide five MW of capacity or Planning Reserve Margin Requirement.  IPL also argued that its Battery Facility already was providing primary frequency response, but there was no provision in MISO’s Tariff to compensate IPL for this reliability service.

In its order responding to IPL’s complaint, FERC found that although an electric storage resource, such as IPL’s Battery Facility, can participate in MISO as a “Stored Energy Resource,” this resource category limits the resource to participation in MISO’s regulation market and does not allow it to qualify for capacity, energy, ramp capability and contingency reserves.  FERC directed MISO to submit a compliance filing proposing Tariff revisions that accommodate participation of all electric storage resources, regardless of technology, in all MISO markets that they are technically capable of participating in, taking into account their unique physical and operational characteristics.  This requirement is similar to the proposed RTO/ISO tariff revisions in the NOPR.

FERC recognized that the issue raised in IPL’s complaint currently is being addressed in its NOPR and stated that, in the event that MISO’s Tariff revisions conflict with required Tariff revisions in any final rule resulting from the NOPR, MISO may be required to adjust its Tariff to align with FERC’s determination in the final rule.

MISO has requested rehearing of FERC’s order.  As is the case with the NOPR, FERC cannot act on the rehearing request until it has a quorum of Commissioners.  On May 8, President Trump announced his intention to nominate Neil Chatterjee, energy policy advisor to Senator Mitch McConnell (R-KY), and Robert F. Powelson, a commissioner on the Pennsylvania Public Utilities Commission and current President of the National Association of Utility Regulatory Commissioners, to two of the open Republican seats on FERC.


[1]Utilization of Electric Storage Resources for Multiple Services When Receiving Cost-Based Rate Recovery, Policy Statement, Docket No. PL17-2-000 (Jan. 19, 2017) (the “Policy Statement”).

[2]Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators, Notice of Proposed Rulemaking, Docket Nos. RM16-23-000 and AD16-20-000 (Nov. 17, 2016) (the “NOPR”).

[3]Western Grid Dev., LLC, 130 FERC ¶ 61,056, reh’g denied, 133 FERC ¶ 61,029 (2010) (“Western Grid”).

[4]Nevada Hydro Co., Inc., 122 FERC ¶ 61,272 (2008), reh’g denied, 133 FERC ¶ 61,155 (2010) (“Nevada Hydro”).

[5]Indianapolis Power & Light Company v. Midcontinent Independent System Operator, Inc., “Order Granting Complaint in Part and Denying Complaint in Part,” 158 FERC ¶ 61,107 (2017).

 

DISCLAIMER: Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© Shearman & Sterling LLP | Attorney Advertising

Written by:

Shearman & Sterling LLP
Contact
more
less

Shearman & Sterling LLP on:

Readers' Choice 2017
Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Custom Email Digest
- hide

JD Supra Privacy Policy

Updated: May 25, 2018:

JD Supra is a legal publishing service that connects experts and their content with broader audiences of professionals, journalists and associations.

This Privacy Policy describes how JD Supra, LLC ("JD Supra" or "we," "us," or "our") collects, uses and shares personal data collected from visitors to our website (located at www.jdsupra.com) (our "Website") who view only publicly-available content as well as subscribers to our services (such as our email digests or author tools)(our "Services"). By using our Website and registering for one of our Services, you are agreeing to the terms of this Privacy Policy.

Please note that if you subscribe to one of our Services, you can make choices about how we collect, use and share your information through our Privacy Center under the "My Account" dashboard (available if you are logged into your JD Supra account).

Collection of Information

Registration Information. When you register with JD Supra for our Website and Services, either as an author or as a subscriber, you will be asked to provide identifying information to create your JD Supra account ("Registration Data"), such as your:

  • Email
  • First Name
  • Last Name
  • Company Name
  • Company Industry
  • Title
  • Country

Other Information: We also collect other information you may voluntarily provide. This may include content you provide for publication. We may also receive your communications with others through our Website and Services (such as contacting an author through our Website) or communications directly with us (such as through email, feedback or other forms or social media). If you are a subscribed user, we will also collect your user preferences, such as the types of articles you would like to read.

Information from third parties (such as, from your employer or LinkedIn): We may also receive information about you from third party sources. For example, your employer may provide your information to us, such as in connection with an article submitted by your employer for publication. If you choose to use LinkedIn to subscribe to our Website and Services, we also collect information related to your LinkedIn account and profile.

Your interactions with our Website and Services: As is true of most websites, we gather certain information automatically. This information includes IP addresses, browser type, Internet service provider (ISP), referring/exit pages, operating system, date/time stamp and clickstream data. We use this information to analyze trends, to administer the Website and our Services, to improve the content and performance of our Website and Services, and to track users' movements around the site. We may also link this automatically-collected data to personal information, for example, to inform authors about who has read their articles. Some of this data is collected through information sent by your web browser. We also use cookies and other tracking technologies to collect this information. To learn more about cookies and other tracking technologies that JD Supra may use on our Website and Services please see our "Cookies Guide" page.

How do we use this information?

We use the information and data we collect principally in order to provide our Website and Services. More specifically, we may use your personal information to:

  • Operate our Website and Services and publish content;
  • Distribute content to you in accordance with your preferences as well as to provide other notifications to you (for example, updates about our policies and terms);
  • Measure readership and usage of the Website and Services;
  • Communicate with you regarding your questions and requests;
  • Authenticate users and to provide for the safety and security of our Website and Services;
  • Conduct research and similar activities to improve our Website and Services; and
  • Comply with our legal and regulatory responsibilities and to enforce our rights.

How is your information shared?

  • Content and other public information (such as an author profile) is shared on our Website and Services, including via email digests and social media feeds, and is accessible to the general public.
  • If you choose to use our Website and Services to communicate directly with a company or individual, such communication may be shared accordingly.
  • Readership information is provided to publishing law firms and authors of content to give them insight into their readership and to help them to improve their content.
  • Our Website may offer you the opportunity to share information through our Website, such as through Facebook's "Like" or Twitter's "Tweet" button. We offer this functionality to help generate interest in our Website and content and to permit you to recommend content to your contacts. You should be aware that sharing through such functionality may result in information being collected by the applicable social media network and possibly being made publicly available (for example, through a search engine). Any such information collection would be subject to such third party social media network's privacy policy.
  • Your information may also be shared to parties who support our business, such as professional advisors as well as web-hosting providers, analytics providers and other information technology providers.
  • Any court, governmental authority, law enforcement agency or other third party where we believe disclosure is necessary to comply with a legal or regulatory obligation, or otherwise to protect our rights, the rights of any third party or individuals' personal safety, or to detect, prevent, or otherwise address fraud, security or safety issues.
  • To our affiliated entities and in connection with the sale, assignment or other transfer of our company or our business.

How We Protect Your Information

JD Supra takes reasonable and appropriate precautions to insure that user information is protected from loss, misuse and unauthorized access, disclosure, alteration and destruction. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. You should keep in mind that no Internet transmission is ever 100% secure or error-free. Where you use log-in credentials (usernames, passwords) on our Website, please remember that it is your responsibility to safeguard them. If you believe that your log-in credentials have been compromised, please contact us at privacy@jdsupra.com.

Children's Information

Our Website and Services are not directed at children under the age of 16 and we do not knowingly collect personal information from children under the age of 16 through our Website and/or Services. If you have reason to believe that a child under the age of 16 has provided personal information to us, please contact us, and we will endeavor to delete that information from our databases.

Links to Other Websites

Our Website and Services may contain links to other websites. The operators of such other websites may collect information about you, including through cookies or other technologies. If you are using our Website or Services and click a link to another site, you will leave our Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We are not responsible for the data collection and use practices of such other sites. This Policy applies solely to the information collected in connection with your use of our Website and Services and does not apply to any practices conducted offline or in connection with any other websites.

Information for EU and Swiss Residents

JD Supra's principal place of business is in the United States. By subscribing to our website, you expressly consent to your information being processed in the United States.

  • Our Legal Basis for Processing: Generally, we rely on our legitimate interests in order to process your personal information. For example, we rely on this legal ground if we use your personal information to manage your Registration Data and administer our relationship with you; to deliver our Website and Services; understand and improve our Website and Services; report reader analytics to our authors; to personalize your experience on our Website and Services; and where necessary to protect or defend our or another's rights or property, or to detect, prevent, or otherwise address fraud, security, safety or privacy issues. Please see Article 6(1)(f) of the E.U. General Data Protection Regulation ("GDPR") In addition, there may be other situations where other grounds for processing may exist, such as where processing is a result of legal requirements (GDPR Article 6(1)(c)) or for reasons of public interest (GDPR Article 6(1)(e)). Please see the "Your Rights" section of this Privacy Policy immediately below for more information about how you may request that we limit or refrain from processing your personal information.
  • Your Rights
    • Right of Access/Portability: You can ask to review details about the information we hold about you and how that information has been used and disclosed. Note that we may request to verify your identification before fulfilling your request. You can also request that your personal information is provided to you in a commonly used electronic format so that you can share it with other organizations.
    • Right to Correct Information: You may ask that we make corrections to any information we hold, if you believe such correction to be necessary.
    • Right to Restrict Our Processing or Erasure of Information: You also have the right in certain circumstances to ask us to restrict processing of your personal information or to erase your personal information. Where you have consented to our use of your personal information, you can withdraw your consent at any time.

You can make a request to exercise any of these rights by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
10 Liberty Ship Way, Suite 300
Sausalito, California 94965

You can also manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard.

We will make all practical efforts to respect your wishes. There may be times, however, where we are not able to fulfill your request, for example, if applicable law prohibits our compliance. Please note that JD Supra does not use "automatic decision making" or "profiling" as those terms are defined in the GDPR.

  • Timeframe for retaining your personal information: We will retain your personal information in a form that identifies you only for as long as it serves the purpose(s) for which it was initially collected as stated in this Privacy Policy, or subsequently authorized. We may continue processing your personal information for longer periods, but only for the time and to the extent such processing reasonably serves the purposes of archiving in the public interest, journalism, literature and art, scientific or historical research and statistical analysis, and subject to the protection of this Privacy Policy. For example, if you are an author, your personal information may continue to be published in connection with your article indefinitely. When we have no ongoing legitimate business need to process your personal information, we will either delete or anonymize it, or, if this is not possible (for example, because your personal information has been stored in backup archives), then we will securely store your personal information and isolate it from any further processing until deletion is possible.
  • Onward Transfer to Third Parties: As noted in the "How We Share Your Data" Section above, JD Supra may share your information with third parties. When JD Supra discloses your personal information to third parties, we have ensured that such third parties have either certified under the EU-U.S. or Swiss Privacy Shield Framework and will process all personal data received from EU member states/Switzerland in reliance on the applicable Privacy Shield Framework or that they have been subjected to strict contractual provisions in their contract with us to guarantee an adequate level of data protection for your data.

California Privacy Rights

Pursuant to Section 1798.83 of the California Civil Code, our customers who are California residents have the right to request certain information regarding our disclosure of personal information to third parties for their direct marketing purposes.

You can make a request for this information by emailing us at privacy@jdsupra.com or by writing to us at:

Privacy Officer
JD Supra, LLC
10 Liberty Ship Way, Suite 300
Sausalito, California 94965

Some browsers have incorporated a Do Not Track (DNT) feature. These features, when turned on, send a signal that you prefer that the website you are visiting not collect and use data regarding your online searching and browsing activities. As there is not yet a common understanding on how to interpret the DNT signal, we currently do not respond to DNT signals on our site.

Access/Correct/Update/Delete Personal Information

For non-EU/Swiss residents, if you would like to know what personal information we have about you, you can send an e-mail to privacy@jdsupra.com. We will be in contact with you (by mail or otherwise) to verify your identity and provide you the information you request. We will respond within 30 days to your request for access to your personal information. In some cases, we may not be able to remove your personal information, in which case we will let you know if we are unable to do so and why. If you would like to correct or update your personal information, you can manage your profile and subscriptions through our Privacy Center under the "My Account" dashboard. If you would like to delete your account or remove your information from our Website and Services, send an e-mail to privacy@jdsupra.com.

Changes in Our Privacy Policy

We reserve the right to change this Privacy Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our Privacy Policy will become effective upon posting of the revised policy on the Website. By continuing to use our Website and Services following such changes, you will be deemed to have agreed to such changes.

Contacting JD Supra

If you have any questions about this Privacy Policy, the practices of this site, your dealings with our Website or Services, or if you would like to change any of the information you have provided to us, please contact us at: privacy@jdsupra.com.

JD Supra Cookie Guide

As with many websites, JD Supra's website (located at www.jdsupra.com) (our "Website") and our services (such as our email article digests)(our "Services") use a standard technology called a "cookie" and other similar technologies (such as, pixels and web beacons), which are small data files that are transferred to your computer when you use our Website and Services. These technologies automatically identify your browser whenever you interact with our Website and Services.

How We Use Cookies and Other Tracking Technologies

We use cookies and other tracking technologies to:

  1. Improve the user experience on our Website and Services;
  2. Store the authorization token that users receive when they login to the private areas of our Website. This token is specific to a user's login session and requires a valid username and password to obtain. It is required to access the user's profile information, subscriptions, and analytics;
  3. Track anonymous site usage; and
  4. Permit connectivity with social media networks to permit content sharing.

There are different types of cookies and other technologies used our Website, notably:

  • "Session cookies" - These cookies only last as long as your online session, and disappear from your computer or device when you close your browser (like Internet Explorer, Google Chrome or Safari).
  • "Persistent cookies" - These cookies stay on your computer or device after your browser has been closed and last for a time specified in the cookie. We use persistent cookies when we need to know who you are for more than one browsing session. For example, we use them to remember your preferences for the next time you visit.
  • "Web Beacons/Pixels" - Some of our web pages and emails may also contain small electronic images known as web beacons, clear GIFs or single-pixel GIFs. These images are placed on a web page or email and typically work in conjunction with cookies to collect data. We use these images to identify our users and user behavior, such as counting the number of users who have visited a web page or acted upon one of our email digests.

JD Supra Cookies. We place our own cookies on your computer to track certain information about you while you are using our Website and Services. For example, we place a session cookie on your computer each time you visit our Website. We use these cookies to allow you to log-in to your subscriber account. In addition, through these cookies we are able to collect information about how you use the Website, including what browser you may be using, your IP address, and the URL address you came from upon visiting our Website and the URL you next visit (even if those URLs are not on our Website). We also utilize email web beacons to monitor whether our emails are being delivered and read. We also use these tools to help deliver reader analytics to our authors to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

Analytics/Performance Cookies. JD Supra also uses the following analytic tools to help us analyze the performance of our Website and Services as well as how visitors use our Website and Services:

  • HubSpot - For more information about HubSpot cookies, please visit legal.hubspot.com/privacy-policy.
  • New Relic - For more information on New Relic cookies, please visit www.newrelic.com/privacy.
  • Google Analytics - For more information on Google Analytics cookies, visit www.google.com/policies. To opt-out of being tracked by Google Analytics across all websites visit http://tools.google.com/dlpage/gaoptout. This will allow you to download and install a Google Analytics cookie-free web browser.

Facebook, Twitter and other Social Network Cookies. Our content pages allow you to share content appearing on our Website and Services to your social media accounts through the "Like," "Tweet," or similar buttons displayed on such pages. To accomplish this Service, we embed code that such third party social networks provide and that we do not control. These buttons know that you are logged in to your social network account and therefore such social networks could also know that you are viewing the JD Supra Website.

Controlling and Deleting Cookies

If you would like to change how a browser uses cookies, including blocking or deleting cookies from the JD Supra Website and Services you can do so by changing the settings in your web browser. To control cookies, most browsers allow you to either accept or reject all cookies, only accept certain types of cookies, or prompt you every time a site wishes to save a cookie. It's also easy to delete cookies that are already saved on your device by a browser.

The processes for controlling and deleting cookies vary depending on which browser you use. To find out how to do so with a particular browser, you can use your browser's "Help" function or alternatively, you can visit http://www.aboutcookies.org which explains, step-by-step, how to control and delete cookies in most browsers.

Updates to This Policy

We may update this cookie policy and our Privacy Policy from time-to-time, particularly as technology changes. You can always check this page for the latest version. We may also notify you of changes to our privacy policy by email.

Contacting JD Supra

If you have any questions about how we use cookies and other tracking technologies, please contact us at: privacy@jdsupra.com.

- hide

This website uses cookies to improve user experience, track anonymous site usage, store authorization tokens and permit sharing on social media networks. By continuing to browse this website you accept the use of cookies. Click here to read more about how we use cookies.