On April 3, 2018, pursuant to the Future Energy Jobs Act (“FEJA”), the Illinois Commerce Commission (“ICC”) issued an Order adopting and modifying the draft Long-Term Renewable Resources Procurement Plan (“LTRRP”) submitted to it by the Illinois Power Agency (“IPA”).  The ICC’s Order, still subject to petitions for rehearing that may be filed by May 3, 2018, notably rejects the IPA’s proposed reliance on spot renewable energy credit (“REC”) purchases to satisfy FEJA provisions.  Instead, the ICC Order envisions procurement of RECs from more new utility-scale projects than contemplated by the IPA’s draft plan submitted to the  ICC in December 2017.  In addition to the one million RECs from such projects, already being obtained through the IPA’s Initial Forward Procurement under FEJA, the ICC Order (at p. 43)  directs the IPA to procure “at least” two million more RECs from new utility-scale solar projects “as soon as possible” instead of the one million RECs the IPA proposed to obtain from such projects in a Spring 2019 procurement. .  The IPA will conduct this accelerated procurement of at least two million more RECs from utility scale solar projects   in 2018 in accordance with a schedule to be announced later this spring. Rules and procedures for utility-scale project REC procurements are now well established through the IPA’s Initial Forward Procurement being completed this month.  For more information on the Initial Forward Procurement, please also see our alerts on March 22, 2018 and Oct. 25, 2017. By contrast, initial smaller solar distributed generation (“DG”) projects (2 MW (AC) or less) authorized by the LTRRP, subject to the Adjustable Block Program for REC procurement, still must await further decisions from the IPA, including final  prices to be paid for RECs from such projects, which may not be published until June 4, 2018.  The ICC Order, however, resolves some DG issues, several of which are discussed below.

Adjustable Block Program for RECs from DG Capacity

While utility-scale projects win the right to obtain a REC sales contract by submitting the lowest bid for a REC price, the Adjustable Block Program offers a published price per REC to qualifying DG projects proposed by “Approved Vendors” properly registered with the IPA in accordance with rules that will not be effective until the IPA appoints a Program Administrator. Under the LTTRP, the “types” of projects are determined by energy capacity.   Three types of DG projects can qualify for the Adjustable Block Program REC prices:  Type 1 – small DG located at customer’s site, up to 10 kW; Type 2 – large  DG located at customer’s site, over 10 kW up to 2 MW; Type  3 – community solar DG,  up to 2 MW  (up to 4 MW of separate projects no greater that 2 MW in capacity may be proposed by the same Approved Vendor  and co-located on the same parcel or contiguous parcels of land, but no one entity can consume more than 40% of  a community solar system’s output).  Subject to certain limitations, Types 1 and 2 DG projects may also qualify for full net metering benefits, while community solar (Type 3) systems may qualify for energy-only net metering benefits.  Smart inverter tariff rebates ($250/kW) may be available to certain Type 2 and community solar projects.  Each of Type 1, 2 and 3 DG is divided into two geographic area groups: DG projects located within the MISO footprint in Illinois, and DG projects located within the PJM footprint in Illinois, mainly the greater Chicago area. Each of the three DG project Types in those geographic areas is allocated a certain amount of DG capacity which proposed DG projects may apply to serve, as explained further below.  Under the LTTRP approved by the April 3 Order, the IPA is directed to obtain one million solar RECs through the Adjustable Block Program by the end of the 2020-21 delivery year.  All DG projects that ultimately are chosen to provide capacity under Adjustable Block Program rates are eligible for 15 year term contracts to sell RECs to Illinois investor-owned electric utilities at REC prices determined and published by the IPA. The contracts are expected to obligate the chosen Approved Vendors to deliver RECs each year of the contract term and to deliver a total amount RECs specified in the contract, although the IPA has yet to publish actual contract forms that Approved Vendors will be expected to sign. The ICC has ruled that final REC contracts will be subject to ICC approval.

Adjustable Block DG Capacity Allocations

The ICC Order affirms that DG projects may be located in the service territories of municipal utilities and rural co-operatives, as well as in the service territories of the two major Illinois investor-owned utilities, and still be eligible for REC sales prices determined under the Adjustable Block Program.  Total DG capacity eligible for Adjustable Block REC prices is allocated between the service territories of the two major Illinois investor-owned electric utilities, plus the service territories of nearby municipal utilities and rural co-operatives, although only the investor-owned utilities are required to purchase RECs from qualifying DG projects under FEJA.  Thus, DG capacity  located in the service territories of municipal utilities and rural cooperatives within the MISO Illinois service territory of one of the major investor-owned utilities would be eligible to apply for the allocation of DG capacity whose RECs would be purchased by that utility, and  DG capacity located in the service territories of such entities within the PJM Illinois service territory of the other major investor owned utility would be eligible to apply for the allocation of DG capacity whose RECs would be purchased by that utility.  Total capacity allocated to each of the MISO and PJM Illinois geographic service territories is sub-divided among solar DG project Types 1, 2 and 3 and into three separate blocks of capacity, Blocks 1, 2 and 3, to be made individually available for DG project application.  Blocks 1 and 2 are assigned the same amount of capacity for each DG project Type, although the amount of total and block DG capacity differs between the MISO and PJM service territories, with the latter receiving a larger allocation than the former due to load differences between the service territories.  Block 3 capacity is equal to approximately 20% of Block 2 capacity for each of DG solar project Types 1, 2 and 3.  The ICC Order directs the IPA to hold about 25% of all available capacity for DG in reserve as discretionary capacity.  How such capacity will be assigned in the future remains to be determined.  Once the IPA sets final prices for RECs to be sold from each block of capacity and establishes all other Adjustable Block Program rules, solar DG project Approved Vendors may apply for the capacity for which their projects are eligible and the associated prices to be paid by investor-owned utilities for the RECs produced by such projects.

Lottery for Adjustable Block DG Capacity Overbooking

The “adjustable” block concept of the program comprehends the possibility that applications for an allocation of capacity from, for example, Block 1 will exceed the amount of capacity assigned to that block.  In such a case, Block 1 would, in effect, expand to include a larger capacity allocation up to a certain limit.  Once the limit is reached, however, the ICC Order confirms that a lottery will be used to determine the winning applicants.  The current limit is 200% of Block 1 capacity.  So if there are qualified applications for more than 200% of the Block 1 capacity allocated for a particular project type, i.e., Type 1, 2 or 3 DG project, a lottery would be employed to determine the winning applicants.  Note that 200% of Block 1 capacity available for any given DG project Type would subsume all of Block 2 capacity for that DG project Type as Block 1 and Block 2 allocated capacity quantities are the same.  In the event of oversubscription for Type 3 (community solar) projects, preference will be given to the projects that would serve a customer base consisting of at least 50% small subscribers.  In an initial lottery, 50% of available funding would be awarded to such projects. Any remaining such community solar projects, and those community solar projects without at least 50% small subscribers, would be eligible to be awarded the remaining 50% of funding through a second lottery.  The ICC Order does not address how qualified solar DG projects not selected by any necessary lottery for Block 1 capacity should be treated by the IPA relative to subsequent capacity blocks in the Adjustable Block Program, including blocks of capacity that may be formed from the 25% discretionary capacity set aside.  The IPA (or the ICC on rehearing) may need to address this issue before the IPA commences the program.

 Adjustable Block REC Prices for DG Projects

As updated on February 27, 2018, the IPA proposed a set of six different REC prices for different levels of DG and Community Solar capacity.  These REC prices also vary between the two major investor-owned electric utilities in Illinois that will purchase RECs from solar DG projects.  The capacity levels to which different REC prices are assigned are:  a) less than or equal to 10 kW; b) greater than 10 kW, up to 25 kW; c) more than 25 kW, up to 100 kW; d) greater than 100 kW, up to 200 kW; e) greater than 200 kW, up to 0.5 MW; f) greater than 0.5 MW up to 2 MW.  Note that the first REC price category applies only to Type 1 projects, whereas the remaining five REC price categories apply to Type 2 and 3 projects relative to their total capacity. In addition, the IPA proposed “adders” for community solar (Type 3) projects according to four different levels of small subscriber participation that also vary between the two major investor-owned electric utilities in Illinois that will purchase RECs from such projects.  The small subscriber participation levels are:  a) less than 25%; b) equal to or more than 25%, up to 50%; c) equal to or more than 50%, up to 75%; d) equal to or more than 75%.  The ICC Order approves this basic structure for Adjustable Block Program REC pricing; but the REC prices published by the IPA on February 27 are not final.  The ICC Order directs the IPA to publish final REC prices within sixty days of the date of the April 3, 2018 ICC Order.

Other Adjustable Block Program Issues

Numerous other issues remain to be resolved before the IPA can commence its Adjustable Block Program.  These include REC contract terms, REC marketing regulations, Approved Vendor requirements, the filing and approval of investor owned utility smart inverter tariffs, net metering cap and transition issues, as well as interconnection procedures.  Moreover, the IPA cannot accept registrations of Approved Vendors until it appoints a Program Administrator.  Currently, the IPA does not expect to commence registration of Approved Vendors for the Adjustable Block Program until autumn of this year.

[View source.]

DISCLAIMER: Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© Bryan Cave Leighton Paisner | Attorney Advertising

Written by:

Bryan Cave Leighton Paisner
Contact
more
less

Bryan Cave Leighton Paisner on:

Readers' Choice 2017
Reporters on Deadline

"My best business intelligence, in one easy email…"

Your first step to building a free, personalized, morning email brief covering pertinent authors and topics on JD Supra:
Sign up using*

Already signed up? Log in here

*By using the service, you signify your acceptance of JD Supra's Privacy Policy.
Custom Email Digest
Privacy Policy (Updated: October 8, 2015):
hide

JD Supra provides users with access to its legal industry publishing services (the "Service") through its website (the "Website") as well as through other sources. Our policies with regard to data collection and use of personal information of users of the Service, regardless of the manner in which users access the Service, and visitors to the Website are set forth in this statement ("Policy"). By using the Service, you signify your acceptance of this Policy.

Information Collection and Use by JD Supra

JD Supra collects users' names, companies, titles, e-mail address and industry. JD Supra also tracks the pages that users visit, logs IP addresses and aggregates non-personally identifiable user data and browser type. This data is gathered using cookies and other technologies.

The information and data collected is used to authenticate users and to send notifications relating to the Service, including email alerts to which users have subscribed; to manage the Service and Website, to improve the Service and to customize the user's experience. This information is also provided to the authors of the content to give them insight into their readership and help them to improve their content, so that it is most useful for our users.

JD Supra does not sell, rent or otherwise provide your details to third parties, other than to the authors of the content on JD Supra.

If you prefer not to enable cookies, you may change your browser settings to disable cookies; however, please note that rejecting cookies while visiting the Website may result in certain parts of the Website not operating correctly or as efficiently as if cookies were allowed.

Email Choice/Opt-out

Users who opt in to receive emails may choose to no longer receive e-mail updates and newsletters by selecting the "opt-out of future email" option in the email they receive from JD Supra or in their JD Supra account management screen.

Security

JD Supra takes reasonable precautions to insure that user information is kept private. We restrict access to user information to those individuals who reasonably need access to perform their job functions, such as our third party email service, customer service personnel and technical staff. However, please note that no method of transmitting or storing data is completely secure and we cannot guarantee the security of user information. Unauthorized entry or use, hardware or software failure, and other factors may compromise the security of user information at any time.

If you have reason to believe that your interaction with us is no longer secure, you must immediately notify us of the problem by contacting us at info@jdsupra.com. In the unlikely event that we believe that the security of your user information in our possession or control may have been compromised, we may seek to notify you of that development and, if so, will endeavor to do so as promptly as practicable under the circumstances.

Sharing and Disclosure of Information JD Supra Collects

Except as otherwise described in this privacy statement, JD Supra will not disclose personal information to any third party unless we believe that disclosure is necessary to: (1) comply with applicable laws; (2) respond to governmental inquiries or requests; (3) comply with valid legal process; (4) protect the rights, privacy, safety or property of JD Supra, users of the Service, Website visitors or the public; (5) permit us to pursue available remedies or limit the damages that we may sustain; and (6) enforce our Terms & Conditions of Use.

In the event there is a change in the corporate structure of JD Supra such as, but not limited to, merger, consolidation, sale, liquidation or transfer of substantial assets, JD Supra may, in its sole discretion, transfer, sell or assign information collected on and through the Service to one or more affiliated or unaffiliated third parties.

Links to Other Websites

This Website and the Service may contain links to other websites. The operator of such other websites may collect information about you, including through cookies or other technologies. If you are using the Service through the Website and link to another site, you will leave the Website and this Policy will not apply to your use of and activity on those other sites. We encourage you to read the legal notices posted on those sites, including their privacy policies. We shall have no responsibility or liability for your visitation to, and the data collection and use practices of, such other sites. This Policy applies solely to the information collected in connection with your use of this Website and does not apply to any practices conducted offline or in connection with any other websites.

Changes in Our Privacy Policy

We reserve the right to change this Policy at any time. Please refer to the date at the top of this page to determine when this Policy was last revised. Any changes to our privacy policy will become effective upon posting of the revised policy on the Website. By continuing to use the Service or Website following such changes, you will be deemed to have agreed to such changes. If you do not agree with the terms of this Policy, as it may be amended from time to time, in whole or part, please do not continue using the Service or the Website.

Contacting JD Supra

If you have any questions about this privacy statement, the practices of this site, your dealings with this Web site, or if you would like to change any of the information you have provided to us, please contact us at: info@jdsupra.com.

- hide
*With LinkedIn, you don't need to create a separate login to manage your free JD Supra account, and we can make suggestions based on your needs and interests. We will not post anything on LinkedIn in your name. Or, sign up using your email address.