Build America Buy America What is it? How to qualify.
Data Centers: Demand, Development, and Future Challenges With Ali Greenwood — TAG Infrastructure Talks Podcast
Preparing for Major Changes to DOT’s Disadvantaged Business Enterprise DBE Program
Charging Transportation Electrification Forward: Identifying Opportunities & Regulatory Solutions in the Rapidly Evolving EV Market - Energy Law Insights
Powering Through the Environmental Challenges of EV Development - Energy Law Insights
Exploring Challenges and Opportunities Within the EV Infrastructure Sector With Kerri Stewart - TAG Infrastructure Talks Podcast
Wiley's 10 Key Trade Developments: The CHIPS Act and Inflation Reduction Act (IRA)
Wiley’s Top 10 Trade Developments: Buy America Requirements
Unveiling Georgia’s Electric Mobility Success Story With Virginia Sengewald — TAG Infrastructure Talks Podcast
Hosted Payload Episode 11: Erin Boone/Interstellar
A Deep Dive Into Broadband Equity, Access, and Deployment With Scott D. Woods — TAG Infrastructure Talks Podcast
Private-Public Investment in Infrastructure: Community Improvement in the Atlanta Area With Kim Menefee — TAG Infrastructure Talks Podcast
Contratación para el Desarrollo de Infraestructura del Agua
El Plan Nacional de Desarrollo
The Data Center Cooling Conundrum With Leland Sparks - TAG Infrastructure Talks Podcast
Podcast - Eficiencia Energética
Creating the Digital Infrastructure Career Path With Carrie Goetz - TAG Infrastructure Talks Podcast
Climate-Proofing Our Infrastructure: Building Climate Resilience with the Army Corps of Engineers
Moving the Ball for Metro Atlanta Mobility: Atlanta Regional Commission - TAG Infrastructure Talks Podcast
Top-Tier Data Centers in Underserved Markets - TAG Infrastructure Talks Podcast
Tel Aviv may be all dug up, and the sidewalks gone, but there is a light at the end of the tunnel – at least at the end of the tunnel between Lincoln Street and Yitzhak Sadeh Street. It isn’t only Tel Aviv that’s dug up. Work...more
The long-awaited Presidio Parkway opened for the first time to Bay Area motorists on July 12th, ahead of schedule and to local and national praises. The $1.1 billion Presidio Parkway replaces Doyle Drive – an outdated...more
On May 15, 2015, the Texas Department of Transportation (TxDOT) and Lane-Abrams Joint Venture (DB Contractor) entered into a design-build contract (DBA) and associated comprehensive maintenance agreement (COMA) for the...more