During last week’s 20 February 2025 open meeting, the Federal Energy Regulatory Commission (FERC) initiated a show cause proceeding, directing grid operator PJM Interconnection, L.L.C. (PJM) and PJM’s transmission-owning...more
On February 20, 2025, FERC found that the PJM Interconnection, L.L.C. (“PJM”) Open Access Transmission Tariff (“OATT”) appears to be unjust and unreasonable because it does not address with clarity or consistency the rates,...more
On October 13, 2023, PJM Interconnection, L.L.C. (“PJM”) submitted two filings with FERC proposing revisions to its Open Access Transmission Tariff (“Tariff”) and its “Reliability Assurance Agreement” (“RAA”) designed to...more
On June 15, 2023, FERC issued two final rules aimed at boosting bulk power system resilience by improving how grid operators assess and plan for extreme weather impacts to the transmission system. One rule directs NERC to...more
On August 23, 2017, the Department of Energy (DOE) released its “Staff Report to the Secretary on Electricity Markets and Reliability,” which was commissioned by U.S. Secretary of Energy Rick Perry in April to provide an...more