Imagine the following. A developer consults with an architect in 2020 about a six-building condominium project. The architect promptly produces a set of plans, which are stamped by an engineer. Over the next three years, the...more
The Massachusetts Statute of Repose requires litigants to assert within six years all tort claims arising out of the design, construction, or administration of improvements to real property. The Statute begins to run upon the...more