Navigating the Inflation Reduction Act: Insights on Brownfield Energy Community Credits - Energy Law Insights
Harnessing Technology in Litigation: Insights from Troutman Pepper eMerge - Energy Law Insights
Growing the Solar and Storage Landscape With Mike Hall, Anza Renewables - Battery + Storage Podcast
Navigating Complexities in Tax Equity Transactions - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 2) - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 1) - Energy Law Insights
Podcast - Gestión del gobierno en el sector de energía: Una mirada desde los entes de control
Navigating Clean Hydrogen Tax Credits: Insights and Implications - Energy Law Insights
Expanding Energy Storage Through Cross-Cultural Insights With Dr. Marco Terruzzin, Energy Vault — Battery + Storage Podcast
Minería en tiempos de transición energética
Storing Gravitational and Hybrid Energy, With Dr. Raj Talluri, Enovix — Battery + Storage Podcast
Podcast - Panorama del sector energético en Colombia
Extending the Flexibility of Energy Storage With Julia Souder, LDESC — Battery + Storage Podcast
Power, Privacy, and Protection: Unpacking Security Challenges in the Energy Sector - Energy Law Insights
Non-Delegation Doctrine, FTC's Non-Compete Rule and Green Guides ... Oh My!
Duke Develops Flexible Energy Storage Options to Enhance Reliability and Maximize Value With Laurel Meeks, Duke Energy — Battery + Storage Podcast
Economics of the Energy Transition: Keith Fullenweider on Wharton Business Daily
Renewable Fuel Standard Outlook
De-Risking Renewable Energy Projects: Identifying and Avoiding Contractual, Economic, Legal, and Regulatory Pitfalls
Powering Anything, Anywhere With Alex Livingston, Joule Case — Battery + Storage Podcast
On April 10, 2025, FERC addressed arguments on rehearing that clarified, but did not modify the outcome of, a November 1, 2024, order (“Rejection Order”) rejecting PJM Interconnection, L.L.C.’s (“PJM”) proposal to increase...more
On March 31, 2025, FERC signaled that it will rule on ISO New England’s proposed interconnection reforms this week—on or before Friday, April 4. In May 2024, ISO New England filed proposed tariff revisions at FERC in...more
On March 20, 2025, FERC denied Ponderosa Power, LLC’s (“Ponderosa”) complaint alleging that NorthWestern Corporation’s (“NorthWestern”) application of its large generator interconnection procedures (“LGIP”) was unjust and...more
On February 28, 2025, FERC granted a request by Holtec Palisades, LLC (“Holtec”) for waiver of certain provisions of the Midcontinent Independent System Operator, Inc. (“MISO”) Open Access Transmission, Energy and Operating...more
Small modular reactors (SMRs) can be collocated with high demand customers such as data centers and large manufacturing and chemical facilities to provide electric energy and capacity to them directly. Behind-the-meter...more
On September 10 and 11, 2024, FERC staff held a two-day workshop at its headquarters in Washington, DC on opportunities to further refine the generator interconnection queue process. Panelists and FERC staff discussed...more
California will solicit up to 2 GW of long-duration energy storage resources as part of a 10.6 GW centralized procurement for emerging clean energy technologies to be deployed between 2031 and 2037, the California Public...more
On July 19, 2024, the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) issued an Order denying Tenaska Clear Creek Wind, LLC’s (“Clear Creek”) challenges to FERC’s orders allowing the...more
On May 8, 2024, the U.S. Department of Energy (“DOE”) released a preliminary list of potential National Interest Electric Transmission Corridors (“NIETCs”), representing another step forward in DOE’s efforts to effectuate...more
On March 28, 2024, the Midcontinent Independent System Operator, Inc. (“MISO”) submitted a filing to the Federal Energy Regulatory Commission (“FERC”) proposing revisions to its Open Access Transmission, Energy and Operating...more
On March 21, 2024, the Federal Energy Regulatory Commission (FERC or Commission) issued a Notice of Proposed Rulemaking (NOPR) in Docket No. RM22-2 that proposes to prohibit transmission providers from allowing generating...more
On 21 March 2024, the Federal Energy Regulatory Commission (FERC) issued Order No. 2023-A, rehearing and clarifying its landmark generator interconnection reform final rule. Order No. 2023-A largely upheld the...more
On July 28, the Federal Energy Regulatory Commission (FERC or the Commission) issued Order No. 2023 (Order No. 2023 or Final Rule), which updates the procedures for interconnecting large generating facilities (20MW and above)...more
The existing U.S. interconnection regime is decades old and ill-equipped to bring large amounts of new renewable power on to the grid. Thankfully that looks set to change....more
The Federal Energy Regulatory Commission (FERC) issued an Advance Notice of Proposed Rulemaking (ANOPR), "Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator...more
On June 17, 2021, the United States Federal Energy Regulatory Commission (FERC) issued an order (Order) establishing a new Joint Federal-State Task Force on Electric Transmission (Task Force), calling for nominations for...more
FERC is in the process of gathering information and building a public record on technical and market issues that are prompted by the growing interest in “hybrid resources.” FERC held a technical conference in the summer of...more
North American development-stage projects interconnecting with Midcontinent Independent System Operator (“MISO”) member utilities may no longer rely on funds deposited for network upgrades being returned if the project...more
In a stakeholder call yesterday, the CAISO discussed the Revised Draft Final Proposal in the Generator Deliverability Assessment stakeholder initiative. During the call, the CAISO addressed outstanding stakeholder questions,...more
On August 13, 2019, the Federal Energy Regulatory Commission (FERC) approved a request by Midcontinent Independent System Operator, Inc. (MISO) to modify its Tariff and pro forma Generator Interconnection Agreement (GIA) to...more
Securing interconnection and transmission rights and completing related upgrades is often the longest lead-time item in an electric generator’s development timeline. At the same time, many potential new power plants are being...more
FERC has issued a Notice of Proposed Rulemaking (NOPR) that would substantially reduce the regulatory burdens placed on energy project developers that construct generator lead lines (gen-tie lines) to interconnect their...more
On July 31, 2014, the Federal Energy Regulatory Commission (FERC) accepted amendments to the California Independent System Operator Corporation (CAISO) tariff designed to improve the efficiency and flexibility of the CAISO’s...more