Navigating the Inflation Reduction Act: Insights on Brownfield Energy Community Credits - Energy Law Insights
Harnessing Technology in Litigation: Insights from Troutman Pepper eMerge - Energy Law Insights
Growing the Solar and Storage Landscape With Mike Hall, Anza Renewables - Battery + Storage Podcast
Navigating Complexities in Tax Equity Transactions - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 2) - Energy Law Insights
Capacity Crunch Series Continued: Balancing Reliability, Unprecedented Load Growth & Affordability in the Energy Transition (Part 1) - Energy Law Insights
Podcast - Gestión del gobierno en el sector de energía: Una mirada desde los entes de control
Navigating Clean Hydrogen Tax Credits: Insights and Implications - Energy Law Insights
Expanding Energy Storage Through Cross-Cultural Insights With Dr. Marco Terruzzin, Energy Vault — Battery + Storage Podcast
Minería en tiempos de transición energética
Storing Gravitational and Hybrid Energy, With Dr. Raj Talluri, Enovix — Battery + Storage Podcast
Podcast - Panorama del sector energético en Colombia
Extending the Flexibility of Energy Storage With Julia Souder, LDESC — Battery + Storage Podcast
Power, Privacy, and Protection: Unpacking Security Challenges in the Energy Sector - Energy Law Insights
Non-Delegation Doctrine, FTC's Non-Compete Rule and Green Guides ... Oh My!
Duke Develops Flexible Energy Storage Options to Enhance Reliability and Maximize Value With Laurel Meeks, Duke Energy — Battery + Storage Podcast
Economics of the Energy Transition: Keith Fullenweider on Wharton Business Daily
Renewable Fuel Standard Outlook
De-Risking Renewable Energy Projects: Identifying and Avoiding Contractual, Economic, Legal, and Regulatory Pitfalls
Powering Anything, Anywhere With Alex Livingston, Joule Case — Battery + Storage Podcast
On April 24, 2025, FERC denied NGO Transmission, Inc.’s (“NGO Transmission”) application under 7(b) of the Natural Gas Act (“NGA”) to abandon its jurisdictional facilities and reclassify them from jurisdictional transmission...more
In its 2024–2025 Draft Transmission Plan (Draft Plan) released on March 31, the California Independent System Operator (CAISO) proposed the development of 31 new transmission projects with an estimated cost of $4.8 billion....more
On February 10, 2025, Pluvia LLC (“Pluvia”) filed a petition for a declaratory order, asking FERC to clarify its jurisdiction to issue a preliminary permit for the construction, operation, and maintenance of transmission...more
On February 28, 2025, FERC granted a request by Holtec Palisades, LLC (“Holtec”) for waiver of certain provisions of the Midcontinent Independent System Operator, Inc. (“MISO”) Open Access Transmission, Energy and Operating...more
Building on the record of two dockets, the Federal Energy Regulatory Commission (FERC) initiated a new proceeding to evaluate certain issues with respect to the co-location of large loads, namely to serve data centers, in the...more
On December 5, 2024, the Federal Energy Regulatory Commission (“FERC”) approved Public Service Electric and Gas Company’s settlement agreement (“PSE&G”) to pay a $6.6 million civil penalty to resolve an ongoing investigation...more
On November 21, 2024, FERC issued Order No. 1920-A, which modified Order No. 1920 to expand the states’ roles in long-term transmission planning and clarified requirements for such planning as set forth in Order No. 1920....more
On October 17, 2024, the Federal Energy Regulatory Commission (FERC) took final action on Order No. 1977, which requires applicants seeking rights of way for electric transmission lines on Tribal lands to include Tribal...more
Governor Tim Walz recently signed the Minnesota Energy Infrastructure Permitting Act and amendments to the certificate of need requirements (Permitting Act). The Permitting Act includes significant reforms to streamline...more
At FERC’s March 2024 Open Meeting, the Commissioners announced a new cooperative effort between FERC and the states: the Federal and State Current Issues Collaborative (“Current Issues Collaborative”)....more
Our office routinely handles utility takings, which often involve partial takings of easements for transmission lines or pipelines. As governments attempt to improve the electrical grid to support the transportation of wind...more
The California Public Utilities Commission (Commission) has uploaded a proposed Order Instituting Rulemaking(OIR) that would revamp the permitting process for siting of electric transmission infrastructure within the state of...more
Linear infrastructure projects, including oil and gas pipelines, electric transmission lines and transportation, have faced a number of regulatory challenges over the last year. Some of these challenges stem from changes in...more