Innovation in Compliance: Visionary Leadership with Jackson Calame
AGG Talks: Cross-Border Business Podcast - Episode 21: The 2024 U.S. Election’s Impact on ESG Regulations
Business Better Podcast Episode: The Infrastructure Investment and Jobs Act – Insights Three Years Later
Project Catalyst: An Economic Development Podcast | Episode 9: The Role of Railways in Economic Development with Brian Gwin of Norfolk Southern
Come & Take It: The Eminent Domain Podcast (Episode #13), Featuring Winstead Shareholder Tom Forestier
Build America Buy America What is it? How to qualify.
Data Centers: Demand, Development, and Future Challenges With Ali Greenwood — TAG Infrastructure Talks Podcast
Preparing for Major Changes to DOT’s Disadvantaged Business Enterprise DBE Program
Charging Transportation Electrification Forward: Identifying Opportunities & Regulatory Solutions in the Rapidly Evolving EV Market - Energy Law Insights
Powering Through the Environmental Challenges of EV Development - Energy Law Insights
Exploring Challenges and Opportunities Within the EV Infrastructure Sector With Kerri Stewart - TAG Infrastructure Talks Podcast
Wiley's 10 Key Trade Developments: The CHIPS Act and Inflation Reduction Act (IRA)
Wiley’s Top 10 Trade Developments: Buy America Requirements
Unveiling Georgia’s Electric Mobility Success Story With Virginia Sengewald — TAG Infrastructure Talks Podcast
Hosted Payload Episode 11: Erin Boone/Interstellar
A Deep Dive Into Broadband Equity, Access, and Deployment With Scott D. Woods — TAG Infrastructure Talks Podcast
Private-Public Investment in Infrastructure: Community Improvement in the Atlanta Area With Kim Menefee — TAG Infrastructure Talks Podcast
Contratación para el Desarrollo de Infraestructura del Agua
El Plan Nacional de Desarrollo
The Data Center Cooling Conundrum With Leland Sparks - TAG Infrastructure Talks Podcast
President Donald Trump issued an executive order (EO) on April 8, 2025, titled "Strengthening the Reliability and Security of the United States Electric Grid." The order marks a significant step in addressing the growing...more
On February 20, 2025, FERC denied Great Basin Transmission, LLC’s (“Great Basin”) request for two transmission incentives for Great Basin’s Southwest Intertie Project-North Transmission Line and associated upgrades to Great...more
On February 20, 2025, FERC found that the PJM Interconnection, L.L.C. (“PJM”) Open Access Transmission Tariff (“OATT”) appears to be unjust and unreasonable because it does not address with clarity or consistency the rates,...more
When there is a change of Administration in Washington, the trade press often inquires about the anticipated changes at the Federal Energy Regulatory Commission (FERC), the primary federal regulator of the nation’s power...more
On November 21, 2024, FERC issued Order No. 1920-A, which modified Order No. 1920 to expand the states’ roles in long-term transmission planning and clarified requirements for such planning as set forth in Order No. 1920....more
On October 17, 2024, the Federal Energy Regulatory Commission (FERC) took final action on Order No. 1977, which requires applicants seeking rights of way for electric transmission lines on Tribal lands to include Tribal...more
On September 19, 2024, the Federal Energy Regulatory Commission (“FERC”) denied Enerwise Global Technologies, LLC’s (“CPower”) complaint against PJM Interconnection, LLC (“PJM”) alleging that PJM’s Open Access Transmission...more
The permitting process has been identified by numerous commentators as a major cause of delays in the development of energy, infrastructure, and mining projects in the United States. ...more
On May 23, 2024, FERC issued an Order denying Lackawanna Energy Center LLC’s (“Lackawanna”) complaint against PJM Interconnection, L.L.C. (“PJM”) alleging that PJM failed to reimburse Lackawanna for lost opportunity costs...more
On May 13, 2024, the Commission announced two major transmission reform final rules: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation (“Order No. 1920”) and Applications for Permits...more
On April 18, 2024, Senators Richard Blumenthal (D-CT) and Cindy Hyde-Smith (R-MS) introduced the Making Pipelines Accountable to Consumers and Taxpayers Act (“MPACT Act”) (S. 4171) that, if adopted, would grant FERC authority...more
At the February 15, 2024, FERC open meeting and in four orders issued the same day, FERC established a new policy governing its issuance of preliminary permits under section 4(f) of the Federal Power Act (“FPA”), pursuant to...more
On December 19, 2023, FERC issued a Notice of Inquiry (“NOI”) to examine whether and how to revise its policy on providing blanket authorizations for holding companies, including investment companies, to acquire securities in...more
On December 1, 2023, the United States Third Circuit Court of Appeals (“Third Circuit”) upheld PJM Interconnection, L.L.C.’s (“PJM”) latest minimum offer price rule (the “Focused MOPR”), denying challenges to both the...more
On September 21, 2023, the Commission approved, in part, PJM Interconnection L.L.C.’s (“PJM”) proposed tariff revisions regarding the calculation of the Financial Transmission Right (“FTR”) credit requirement (“September...more
FERC has issued its final rule paving the way for incentive-based rate treatment for electric utilities that make certain voluntary cybersecurity investments. As we first noted in 2020 when describing the proposed rule, the...more
At its open monthly meeting on March 16, 2023, the Federal Energy Regulatory Commission (FERC) approved a new cybersecurity standard proposed by the North American Electric Reliability Corporation (NERC) to address the supply...more
On Thursday, December 15, 2022, the Federal Energy Regulatory Commission (“FERC” or “Commission”) issued a Notice of Proposed Rulemaking (“NOPR”) proposing changes to FERC’s authority under section 216 of the Federal Power...more
On June 16, 2022, the Federal Energy Regulatory Commission (FERC) issued a Notice of Proposed Rulemaking (NOPR) entitled 'Improvements to Generator Interconnection Procedures and Agreements.' The reforms aim to address...more
Below are summaries of the agenda items for the Federal Energy Regulatory Commission's April 21, 2022 open meeting, pursuant to the sunshine notice released on April 14, 2022....more
FERC issued an original license for a period of 25 years, pursuant to Part I of the Federal Power Act, to Oregon State University (OSU) to construct, operate, and maintain the proposed PacWave South Hydrokinetic Project No....more
Under the Federal Power Act (FPA), the US Federal Energy Regulatory Commission (“FERC” or “Commission”) licenses and regulates over 1,600 hydroelectric project dams, diversions, and related hydropower facilities....more
FERC has issued a notice of inquiry inviting comments on potential changes to its regulations requiring financial assurance measures in licenses and other authorizations for hydroelectric projects. As of December 2020, FERC...more
At its December open meeting, FERC proposed to establish rules for incentive-based rate treatments for voluntary cybersecurity investments by a public utility. If approved, the regulations would provide incentives for...more
The Federal Energy Regulatory Commission (FERC) issued Order 569-A on May 21, significantly revising the methodology used to analyze the base return on equity (ROE) of a public utility’s rates under the Federal Power Act....more